Skip to content
PoliticalRepoPoliticalRepo

European Union · Decision · BUD

2005/2079(BUD)

Amending budget 3/2005: mobilisation of the flexibility instrument for rehabilitation and reconstruction following the tsunami disaster

votedEuropean Union· European Parliament· EN

Introduced

6 September 2005

Last action

14 October 2005 · publication official journal

Status

PLENARY_VOTE

Sponsors

—

Subjects

Budget

Source updated

14 October 2005

Budget

Official titles

Authentic titles published by the source. The stored canonical title is not replaced.

20 official languages
  • Bulgarian

    .

  • Czech

    Opravný rozpočet 4/2005: využití nástroje pružnosti pro obnovu a rekonstrukci v souvislosti s následky tsunami

  • Danish

    Ændringsbudget 4/2005: Anvendelse af fleksibilitetsinstrumentet til fordel for rehabilitering og genopbygning efter Tsunami-katastrofen

  • German

    Berichtigungshaushalt 4/2005: Inanspruchnahme des Flexibilitätsinstruments zum Wiederaufbau nach der Tsunamikatastrophe

  • Greek

    Διορθωτικός προϋπολογισμός 4/2005 : χρησιμοποίηση του μέσου ευελιξίας για την αποκατάσταση και την ανοικοδόμηση μετά την καταστροφή που προκάλεσε το τσουνάμι

  • Spanish

    Presupuesto rectificativo 4/2005: Movilización del instrumento de flexibilidad para la rehabilitación y la reconstrucción tras la catástrofe del tsunami

  • Estonian

    Paranduseelarve nr 4/2005: paindlikkusinstrumendi kasutuselevõtt tsunamikatastroofi järgse taastamise ja ülesehitamise jaoks

  • Finnish

    Korjaava talousarvio 4/2005: joustovälineen käyttöön ottaminen tsunami-katastrofin jälkeistä kunnostusta ja jälleenrakentamista varten

  • French

    Budget rectificatif 4/2005 : Mobilisation de l'instrument de flexibilité pour la réhabilitation et la reconstruction suite au désastre du Tsunami

  • Hungarian

    4/2005 sz. költségvetés-módosítás: A rugalmassági eszköz mozgósítása a szökőár-katasztrófát követő rehabilitációra és újjáépítésre

  • Italian

    Bilancio rettificativo 4/2005: attivazione dello strumento di flessibilità per il risanamento e la ricostruzione dopo la catastrofe dello tsunami

  • Lithuanian

    Pakeičiantis biudžetas Nr.3/2005: lankstumo priemonės panaudojimas nuo cunamio nukentėjusių šalių atstatymui ir rekonstrukcijai

  • Latvian

    Budžeta grozījumi Nr. 4/2005: elastības fonda mobilizēšana rehabilitācijai un rekonstrukcijai pēc cunami katastrofas

  • Maltese

    Baġit li jemenda 3/2005: mobilizzazzjoni ta' l-istrument ta' flessibiltà għar-rijabilitazzjoni u r-rikostruzzjoni wara d-diżastru taz-tsunami

  • Dutch

    Gewijzigde begroting 4/2005: toepassing van het flexibiliteitsinstrument voor het herstel en de wederopbouw na de tsunami

  • Polish

    Budżet korygujący 4/2005: uruchomienie instrumentu elastyczności na rzecz wspomagania odnowy i odbudowy po zniszczeniach spowodowanych tsunami

  • Portuguese

    Orçamento rectificativo 3/2005: Mobilização do instrumento de flexibilidade para a reabilitação e a reconstrução na sequência do desastre do Tsunami

  • Slovak

    Opravný rozpočet č. 4/2005: mobilizácia nástroja pružnosti na obnovu a rekonštrukciu po katastrofe tsunami

  • Slovenian

    Sprememba proračuna 4/2005: sprostitev instrumenta prilagodljivosti za sanacijo in obnovo po cunamiju

  • Swedish

    Ändringsbudget 3/2005: Användning av flexibilitetsmekanismen för sanering och återuppbyggnad efter tsunamikatastrofen

Records

Official decision 2005/2079(BUD) from European Union at European Parliament. Dated 6 September 2005. Status: PLENARY_VOTE.

Timeline

  1. 6 September 2005

    referral

    Source: REFERRAL

  2. 6 September 2005

    Introduced

    Amending budget 3/2005: mobilisation of the flexibility instrument for rehabilitation and reconstruction following the tsunami disaster

    Source: BUD

  3. 7 September 2005

    Vote results

    Source: PLENARY_VOTE_RESULTS

  4. 14 October 2005

    publication official journal

    Source: PUBLICATION_OFFICIAL_JOURNAL

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

3 official files

PV-6-2005-09-07-VOT-ITM-004

Download file

This file cannot be previewed here. Use View or Download.

Reading translation

Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • PV-6-2005-09-07-VOT-ITM-004

    DownloadOpen at official source

  • A-6-2005-0255

    DownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • C-6-2005-0239

    DownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

Sponsors

No sponsors or actors listed by the source.

Related records

No cross-record relationships stored yet.

Related across the Repo ecosystem

Direct relationships are identifier-backed. Topic context means shared TopicMembership — not a citation and not causation.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.