PQ 118
115 Mr. Ring asked the Minister for Communications, Marine and Natural Resources if it is considered satisfactory that the onshore pipeline trench connecting the wellhead to the refinery at the gas terminal (details supplied) in County Mayo will carry an upstream pipeline of 20 in. in length, a waste pipe of 10 in. and umbilical cable operating at pressure of 610 bar, when Bord Gáis Éireann carries just one pipe in its trench lines. [6376/05]
Introduced
24 February 2005
Last action
—
Status
written
Sponsors
—
Subjects
Discovery layer
Source updated
24 February 2005
Summary
115 Mr. Ring asked the Minister for Communications, Marine and Natural Resources if it is considered satisfactory that the onshore pipeline trench connecting the wellhead to the refinery at the gas terminal (details supplied) in County Mayo will carry an upstream pipeline of 20 in. in length, a waste pipe of 10 in. and umbilical cable operating at pressure of 610 bar, when Bord Gáis Éireann carries just one pipe in its trench lines. [6376/05]
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Gas Pipelines.
Gas Pipelines.
xml · EN · 24 February 2005
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.oireachtas.ie/en/debates/question/2005-02-24/118/
- Open data entity: https://data.oireachtas.ie/ie/oireachtas/question/2005-02-24/pq_118