193. Deputy Darren O'Rourke asked the Minister for the Environment, Climate and Communications the way in which the North-South Interconnector will be constructed if Eirgrid or the construction contractors ESB do not have permission from land owners to access private land; and if he will make a statement on the matter. [38235/20]

askedIreland· Dáil Éireann· EN

Introduced

24 November 2020

Last action

24 November 2020 · North-South Interconnector

Status

written

Sponsors

Darren O'Rourke

Subjects

Climate

Source updated

24 November 2020

Climate

Summary

193. Deputy Darren O'Rourke asked the Minister for the Environment, Climate and Communications the way in which the North-South Interconnector will be constructed if Eirgrid or the construction contractors ESB do not have permission from land owners to access private land; and if he will make a statement on the matter. [38235/20]

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 24 November 2020

    North-South Interconnector

    193. Deputy Darren O'Rourke asked the Minister for the Environment, Climate and Communications the way in which the North-South Interconnector will be constructed if Eirgrid or the construction contractors ESB do not have permission from land owners to access private land; and if he will make a statement on the matter. [38235/20]

    Source: written

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

North-South Interconnector

View fileDownload file

Sponsors

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.