Skip to content
PoliticalRepoPoliticalRepo

Ireland · Question · written

PQ 198

198. Deputy Aisling Dempsey asked the Minister for Transport if he will request the NTA to examine the feasibility of establishing a dedicated shuttle bus service along the emerging preferred route for the proposed Navan rail line, serving Navan, Kilmessan and Dunshaughlin and connecting passengers with the existing rail services at M3 Parkway-Dunboyne; and if consideration will be given to operating such a service as an interim public transport measure pending the delivery of the Navan rail line, with timetables coordinated with train departures and arrivals to facilitate commuting to and from Dublin. [67573/26]

askedIreland· Dáil Éireann· EN

Introduced

24 September 2026

Last action

24 September 2026 · Rail Network

Status

written

Sponsors

Aisling Dempsey

Subjects

Transport

Source updated

24 September 2026

Transport

Summary

198. Deputy Aisling Dempsey asked the Minister for Transport if he will request the NTA to examine the feasibility of establishing a dedicated shuttle bus service along the emerging preferred route for the proposed Navan rail line, serving Navan, Kilmessan and Dunshaughlin and connecting passengers with the existing rail services at M3 Parkway-Dunboyne; and if consideration will be given to operating such a service as an interim public transport measure pending the delivery of the Navan rail line, with timetables coordinated with train departures and arrivals to facilitate commuting to and from Dublin. [67573/26]

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 24 September 2026

    Rail Network

    198. Deputy Aisling Dempsey asked the Minister for Transport if he will request the NTA to examine the feasibility of establishing a dedicated shuttle bus service along the emerging preferred route for the proposed Navan rail line, serving Navan, Kilmessan and Dunshaughlin and connecting passengers with the existing rail services at M3 Parkway-Dunboyne; and if consideration will be given to operating such a service as an interim public transport measure pending the delivery of the Navan rail line, with timetables coordinated with train departures and arrivals to facilitate commuting to and from Dublin. [67573/26]

    Source: written

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.