Skip to content
PoliticalRepoPoliticalRepo

Ireland · Question · written

PQ 27

27. Deputy Pauline Tully asked the Minister for the Environment, Climate and Communications if the review currently being conducted by his Department into the North-South Interconnector has queried why EirGrid overturned its previous preference of an overhead line for the Kildare-Meath grid upgrade in favour of a 400kV underground cable; if the review has since examined this as a preferable option for the North-South Interconnector; and if he will make a statement on the matter. [53703/21]

askedIreland· Dáil Éireann· EN

Introduced

4 November 2021

Last action

Status

written

Sponsors

Subjects

Discovery layer

Source updated

4 November 2021

Summary

27. Deputy Pauline Tully asked the Minister for the Environment, Climate and Communications if the review currently being conducted by his Department into the North-South Interconnector has queried why EirGrid overturned its previous preference of an overhead line for the Kildare-Meath grid upgrade in favour of a 400kV underground cable; if the review has since examined this as a preferable option for the North-South Interconnector; and if he will make a statement on the matter. [53703/21]

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

No timeline events have been ingested for this record yet.

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

North-South Interconnector

View fileDownload file

Sponsors

No sponsors or actors listed by the source.

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.