Skip to content
PoliticalRepoPoliticalRepo

Ireland · Question · written

PQ 317

317. Deputy Grace Boland asked the Minister for Transport the current status of the procurement of a replacement traffic management system; the estimated cost of same; and the current estimated date by which the replacement system will be fully operational. [65425/26]

askedIreland· Dáil Éireann· EN

Introduced

16 September 2026

Last action

16 September 2026 · Rail Network

Status

written

Sponsors

Grace Boland

Subjects

Transport

Source updated

16 September 2026

Transport

Summary

317. Deputy Grace Boland asked the Minister for Transport the current status of the procurement of a replacement traffic management system; the estimated cost of same; and the current estimated date by which the replacement system will be fully operational. [65425/26]

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 16 September 2026

    Rail Network

    317. Deputy Grace Boland asked the Minister for Transport the current status of the procurement of a replacement traffic management system; the estimated cost of same; and the current estimated date by which the replacement system will be fully operational. [65425/26]

    Source: written

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

  • Grace Boland · Asking member
  • Transport · Transport · Addressed to

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.