PQ 400
450 Mr. Ring asked the Minister for Education and Science if the proper procedures were put in place in relation to a school (details supplied) in County Mayo; the tests which were carried out on the tiles and roof of this school; if there were regular inspections of the roof as it was in progress; the person who carried out the inspections; the reports which are available on file in this matter; if she will provide this Deputy with a copy of the reports on file; if all these inspections were carried out in the first instance, the reason it was necessary to change the design when the school was being re-roofed; the further reason this design was put in place when the building was roofed on the first occasion; and if she will make a statement on the matter. [29936/04]
Introduced
23 November 2004
Last action
23 November 2004 · Schools Refurbishment.
Status
written
Sponsors
Ring, Michael.
Subjects
Education
Source updated
23 November 2004
Summary
450 Mr. Ring asked the Minister for Education and Science if the proper procedures were put in place in relation to a school (details supplied) in County Mayo; the tests which were carried out on the tiles and roof of this school; if there were regular inspections of the roof as it was in progress; the person who carried out the inspections; the reports which are available on file in this matter; if she will provide this Deputy with a copy of the reports on file; if all these inspections were carried out in the first instance, the reason it was necessary to change the design when the school was being re-roofed; the further reason this design was put in place when the building was roofed on the first occasion; and if she will make a statement on the matter. [29936/04]
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
23 November 2004
Schools Refurbishment.
450 Mr. Ring asked the Minister for Education and Science if the proper procedures were put in place in relation to a school (details supplied) in County Mayo; the tests which were carried out on the tiles and roof of this school; if there were regular inspections of the roof as it was in progress; the person who carried out the inspections; the reports which are available on file in this matter; if she will provide this Deputy with a copy of the reports on file; if all these inspections were carried out in the first instance, the reason it was necessary to change the design when the school was being re-roofed; the further reason this design was put in place when the building was roofed on the first occasion; and if she will make a statement on the matter. [29936/04]
Source: written
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Schools Refurbishment.
Schools Refurbishment.
xml · EN · 23 November 2004
Sponsors
- Ring, Michael. · Asking member
- Minister for Education and Science · Minister for Education and Science · Addressed to
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.oireachtas.ie/en/debates/question/2004-11-23/400/
- Open data entity: https://data.oireachtas.ie/ie/oireachtas/question/2004-11-23/pq_400
- ireland · q-2004-11-23-pq_400 · source updated 23 November 2004