507. Deputy Tom Hayes asked the Minister for Public Expenditure and Reform if he will confirm that the raised banks that confine the Auk Stream West, that were mistakenly omitted from the design phase of Clonmel flood relief scheme, prevent access of high frequency floodwater from the land of a person (details supplied) to the designated spillway of the new Dry-Arch Bridge and as a consequence, the person's lands at Greenane will suffer increased interference during all flood frequencies, including high frequency events, as a result of the Office of Public Works flood relief works. [16356/13]
Introduced
16 April 2013
Last action
16 April 2013 · Flood Prevention Measures
Status
written
Sponsors
Tom Hayes
Subjects
Discovery layer
Source updated
16 April 2013
Summary
507. Deputy Tom Hayes asked the Minister for Public Expenditure and Reform if he will confirm that the raised banks that confine the Auk Stream West, that were mistakenly omitted from the design phase of Clonmel flood relief scheme, prevent access of high frequency floodwater from the land of a person (details supplied) to the designated spillway of the new Dry-Arch Bridge and as a consequence, the person's lands at Greenane will suffer increased interference during all flood frequencies, including high frequency events, as a result of the Office of Public Works flood relief works. [16356/13]
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
16 April 2013
Flood Prevention Measures
507. Deputy Tom Hayes asked the Minister for Public Expenditure and Reform if he will confirm that the raised banks that confine the Auk Stream West, that were mistakenly omitted from the design phase of Clonmel flood relief scheme, prevent access of high frequency floodwater from the land of a person (details supplied) to the designated spillway of the new Dry-Arch Bridge and as a consequence, the person's lands at Greenane will suffer increased interference during all flood frequencies, including high frequency events, as a result of the Office of Public Works flood relief works. [16356/13]
Source: written
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Flood Prevention Measures
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Flood Prevention Measures
xml · EN · 16 April 2013
Sponsors
- Tom Hayes · Asking member
- Public · Public · Addressed to
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.oireachtas.ie/en/debates/question/2013-04-16/507/
- Open data entity: https://data.oireachtas.ie/ie/oireachtas/question/2013-04-16/pq_507
- ireland · q-2013-04-16-pq_507 · source updated 16 April 2013