PoliticalRepoPoliticalRepo

Ireland · Question · written

PQ 52

74 Mr. Eamon Ryan asked the Minister for Transport the analysis his Department has carried out to examine the feasibility of continuing the tunnelling machines for the proposed Dublin metro from the proposed station at St. Stephen’s Green onto a connecting point with the existing Sandyford Luas line; if the Government has a proposed timetable for such an initiative; if it will be possible to run metro carriages on the Luas line south of Ranelagh; and the upgrades which would be required for such metro services to be run to Sandyford and beyond to Cherrywood. [9201/06]

askedIreland· Dáil Éireann· EN

Introduced

7 March 2006

Last action

Status

written

Sponsors

Subjects

Discovery layer

Source updated

7 March 2006

Summary

74 Mr. Eamon Ryan asked the Minister for Transport the analysis his Department has carried out to examine the feasibility of continuing the tunnelling machines for the proposed Dublin metro from the proposed station at St. Stephen’s Green onto a connecting point with the existing Sandyford Luas line; if the Government has a proposed timetable for such an initiative; if it will be possible to run metro carriages on the Luas line south of Ranelagh; and the upgrades which would be required for such metro services to be run to Sandyford and beyond to Cherrywood. [9201/06]

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

No timeline events have been ingested for this record yet.

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Light Rail Project.

View fileDownload file

Sponsors

No sponsors or actors listed by the source.

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.