PoliticalRepoPoliticalRepo

Ireland · Question · written

PQ 595

595. Deputy Mary Butler asked the Minister for Transport, Tourism and Sport the status of the N25 Waterford to Glenmore scheme project; the Exchequer and EU funding allocated to the project; the total project cost; the time frame for each phase envisaged under the project from appraisal, design and construction stage; if funding is being drawn down under the EU TEN-T; and the changes in environmental legislation, design standards and requirements under the Public Spending Code that resulted in new route corridor options being developed for the project. [10430/20]

askedIreland· Dáil Éireann· EN

Introduced

9 June 2020

Last action

9 June 2020 · Road Projects

Status

written

Sponsors

Butler, Mary.

Subjects

Transport

Source updated

9 June 2020

Transport

Summary

595. Deputy Mary Butler asked the Minister for Transport, Tourism and Sport the status of the N25 Waterford to Glenmore scheme project; the Exchequer and EU funding allocated to the project; the total project cost; the time frame for each phase envisaged under the project from appraisal, design and construction stage; if funding is being drawn down under the EU TEN-T; and the changes in environmental legislation, design standards and requirements under the Public Spending Code that resulted in new route corridor options being developed for the project. [10430/20]

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 9 June 2020

    Road Projects

    595. Deputy Mary Butler asked the Minister for Transport, Tourism and Sport the status of the N25 Waterford to Glenmore scheme project; the Exchequer and EU funding allocated to the project; the total project cost; the time frame for each phase envisaged under the project from appraisal, design and construction stage; if funding is being drawn down under the EU TEN-T; and the changes in environmental legislation, design standards and requirements under the Public Spending Code that resulted in new route corridor options being developed for the project. [10430/20]

    Source: written

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Sponsors

  • Butler, Mary. · Asking member
  • Transport · Transport · Addressed to

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.