PQ 607
607. Deputy Anne Rabbitte asked the Minister for Transport, Tourism and Sport his plans regarding the upgrade of the N63 from the Abbeyknockmoy health centre to the monastery gates; if the current location of the 80 mm diameter group water scheme pipe and the transfer connections to the 350 mm and 400 mm have been taken into account; his further plans to deal with this issue; if he has liaised with the Department of Communications, Climate Action and Environment and the residents; and if he will make a statement on the matter. [25832/17]
Introduced
30 May 2017
Last action
—
Status
written
Sponsors
—
Subjects
Discovery layer
Source updated
30 May 2017
Summary
607. Deputy Anne Rabbitte asked the Minister for Transport, Tourism and Sport his plans regarding the upgrade of the N63 from the Abbeyknockmoy health centre to the monastery gates; if the current location of the 80 mm diameter group water scheme pipe and the transfer connections to the 350 mm and 400 mm have been taken into account; his further plans to deal with this issue; if he has liaised with the Department of Communications, Climate Action and Environment and the residents; and if he will make a statement on the matter. [25832/17]
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Road Network
Road Network
xml · EN · 30 May 2017
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.oireachtas.ie/en/debates/question/2017-05-30/607/
- Open data entity: https://data.oireachtas.ie/ie/oireachtas/question/2017-05-30/pq_607