Skip to content
PoliticalRepoPoliticalRepo

Ireland · Question · written

PQ 633

633. Deputy Timmy Dooley asked the Minister for Transport, Tourism and Sport how long the design and planning stages for the revised metro north project will take; and if the revisions made to the original project are justified in terms of Exchequer savings and a passenger cost-benefit analysis, given the additional length of time the revised project will take to go through planning and design stages and to be granted a railway order in comparison with the original project. [44782/15]

askedIreland· Dáil Éireann· EN

Introduced

15 December 2015

Last action

Status

written

Sponsors

Subjects

Discovery layer

Source updated

15 December 2015

Summary

633. Deputy Timmy Dooley asked the Minister for Transport, Tourism and Sport how long the design and planning stages for the revised metro north project will take; and if the revisions made to the original project are justified in terms of Exchequer savings and a passenger cost-benefit analysis, given the additional length of time the revised project will take to go through planning and design stages and to be granted a railway order in comparison with the original project. [44782/15]

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

No timeline events have been ingested for this record yet.

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Light Rail Projects

View fileDownload file

Sponsors

No sponsors or actors listed by the source.

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.