PQ 700
793 Deputy Catherine Murphy asked the Minister for Transport, Tourism and Sport the analysis the National Transport Authority has carried out to model traffic projection over the next ten years in the greater Dublin area; and if in the absence of the introduction of the Dublin metro system and the East Wall rail interconnector, how he expects to avoid major traffic congestion on the M50 and other strategic sections of the road network should there be an increase in traffic volumes due to a return to economic growth in the same time period. [20482/12]
Introduced
24 April 2012
Last action
—
Status
written
Sponsors
—
Subjects
Discovery layer
Source updated
24 April 2012
Summary
793 Deputy Catherine Murphy asked the Minister for Transport, Tourism and Sport the analysis the National Transport Authority has carried out to model traffic projection over the next ten years in the greater Dublin area; and if in the absence of the introduction of the Dublin metro system and the East Wall rail interconnector, how he expects to avoid major traffic congestion on the M50 and other strategic sections of the road network should there be an increase in traffic volumes due to a return to economic growth in the same time period. [20482/12]
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Traffic Management
Traffic Management
xml · EN · 24 April 2012
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.oireachtas.ie/en/debates/question/2012-04-24/700/
- Open data entity: https://data.oireachtas.ie/ie/oireachtas/question/2012-04-24/pq_700