1,019 records where Eugene Murphy is listed as a sponsor, author, or other actor. Search with topics and years

Question· writtenPQ 137asked

137. Deputy Eugene Murphy asked the Minister for Health if the €9 million for a replacement 50-bed unit at the Sacred Heart Hospital, County Roscommon, has been ring-fenced; if the project is still included in the HSE capital plan 2017 to 2021 in view of the overspend on the national children’s hospital; the status of the project; and if he will make a statement on the matter. [7534/19]

Ireland · Dáil Éireann · 14 February 2019

137. Deputy Eugene Murphy asked the Minister for Health if the €9 million for a replacement 50-bed unit at the Sacred Heart Hospital, County Roscommon, has been ring-fenced; if the project is still included in the HSE capital plan 2017 to 2021 in view of the overspend on the national children’s hospital; the status of the project; and if he will make a statement on the matter. [7534/19]

Question· writtenPQ 531asked

531. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine if a co-ordinated approach in respect of food imports and exports for SMEs to Northern Ireland and the UK in the event of a no-deal Brexit has been developed; and if he will make a statement on the matter. [6509/19]

Ireland · Dáil Éireann · 12 February 2019

531. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine if a co-ordinated approach in respect of food imports and exports for SMEs to Northern Ireland and the UK in the event of a no-deal Brexit has been developed; and if he will make a statement on the matter. [6509/19]

Question· writtenPQ 525asked

525. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine if the relevant departmental officials have spoken to their counterparts in the UK with regard to food production and the transport of raw materials such as milk from Northern Ireland to here for processing and re-exporting of manufacturing products to England as a result of Brexit; his plans in place in this regard; and if he will make a statement on the matter. [6324/19]

Ireland · Dáil Éireann · 12 February 2019

525. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine if the relevant departmental officials have spoken to their counterparts in the UK with regard to food production and the transport of raw materials such as milk from Northern Ireland to here for processing and re-exporting of manufacturing products to England as a result of Brexit; his plans in place in this regard; and if he will make a statement on the matter. [6324/19]

Question· writtenPQ 405asked

405. Deputy Eugene Murphy asked the Minister for Health the status of the planned €7.85 million national rehabilitation unit at Roscommon County Hospital, which was approved in 2015 for a 20-bed unit to be managed in conjunction with the service in Dún Laoghaire; when the design phase will be completed; when construction is expected to commence; if funding for the project is included in the HSE capital plan; and if he will make a statement on the matter. [6532/19]

Ireland · Dáil Éireann · 12 February 2019

405. Deputy Eugene Murphy asked the Minister for Health the status of the planned €7.85 million national rehabilitation unit at Roscommon County Hospital, which was approved in 2015 for a 20-bed unit to be managed in conjunction with the service in Dún Laoghaire; when the design phase will be completed; when construction is expected to commence; if funding for the project is included in the HSE capital plan; and if he will make a statement on the matter. [6532/19]

Question· writtenPQ 354asked

354. Deputy Eugene Murphy asked the Minister for Health the arrangements and-or instructions issued to the HSE with regard to the supply of vital medicines in respect of Brexit; and if he will make a statement on the matter. [6332/19]

Ireland · Dáil Éireann · 12 February 2019

354. Deputy Eugene Murphy asked the Minister for Health the arrangements and-or instructions issued to the HSE with regard to the supply of vital medicines in respect of Brexit; and if he will make a statement on the matter. [6332/19]

Question· writtenPQ 346asked

346. Deputy Eugene Murphy asked the Minister for Health when a resubmitted application seeking reimbursement for Translarna (details supplied) will be processed by the HSE; when the drugs committee will assess the submission; when a decision will issue; and if he will make a statement on the matter. [6285/19]

Ireland · Dáil Éireann · 12 February 2019

346. Deputy Eugene Murphy asked the Minister for Health when a resubmitted application seeking reimbursement for Translarna (details supplied) will be processed by the HSE; when the drugs committee will assess the submission; when a decision will issue; and if he will make a statement on the matter. [6285/19]

Question· writtenPQ 328asked

328. Deputy Eugene Murphy asked the Minister for Business, Enterprise and Innovation if the relevant Departments have engaged with the CEOs of the various food companies and SMEs that conduct business here or have a workforce in the UK in the event of a no-deal Brexit; and if she will make a statement on the matter. [6466/19]

Ireland · Dáil Éireann · 12 February 2019

328. Deputy Eugene Murphy asked the Minister for Business, Enterprise and Innovation if the relevant Departments have engaged with the CEOs of the various food companies and SMEs that conduct business here or have a workforce in the UK in the event of a no-deal Brexit; and if she will make a statement on the matter. [6466/19]

Question· writtenPQ 245asked

245. Deputy Eugene Murphy asked the Minister for Education and Skills the steps he has taken to safeguard ongoing educational programmes and educational co-operation with other EU states regarding students on exchange programmes in the event of a no-deal Brexit; and if he will make a statement on the matter. [6506/19]

Ireland · Dáil Éireann · 12 February 2019

245. Deputy Eugene Murphy asked the Minister for Education and Skills the steps he has taken to safeguard ongoing educational programmes and educational co-operation with other EU states regarding students on exchange programmes in the event of a no-deal Brexit; and if he will make a statement on the matter. [6506/19]

Question· oralPQ 6asked

6. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine the commencement date for the beef environmental economic pilot scheme; if the terms and conditions of the scheme have already been drawn up and issued to suckler cow farmers; if agreement has been reached with the mart co-operatives on the weighing of animals for the scheme; and if he will make a statement on the matter. [5443/19]

Ireland · Dáil Éireann · 6 February 2019

6. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine the commencement date for the beef environmental economic pilot scheme; if the terms and conditions of the scheme have already been drawn up and issued to suckler cow farmers; if agreement has been reached with the mart co-operatives on the weighing of animals for the scheme; and if he will make a statement on the matter. [5443/19]

Question· writtenPQ 227asked

227. Deputy Eugene Murphy asked the Minister for Education and Skills if children with Down's syndrome will be included in the July provision programme; his plans to ensure that individual education plans for children with Down's syndrome are provided as part of vital education supports; and if he will make a statement on the matter. [5132/19]

Ireland · Dáil Éireann · 5 February 2019

227. Deputy Eugene Murphy asked the Minister for Education and Skills if children with Down's syndrome will be included in the July provision programme; his plans to ensure that individual education plans for children with Down's syndrome are provided as part of vital education supports; and if he will make a statement on the matter. [5132/19]

Question· writtenPQ 80asked

80. Deputy Eugene Murphy asked the Minister for Health if HSE funding will be ring-fenced for the provision of care for Alzheimer's sufferers in County Roscommon by funding two full days respite in the Sacred Heart Hospital, Roscommon during weekend periods (details supplied); and if he will make a statement on the matter. [4986/19]

Ireland · Dáil Éireann · 5 February 2019

80. Deputy Eugene Murphy asked the Minister for Health if HSE funding will be ring-fenced for the provision of care for Alzheimer's sufferers in County Roscommon by funding two full days respite in the Sacred Heart Hospital, Roscommon during weekend periods (details supplied); and if he will make a statement on the matter. [4986/19]

Question· writtenPQ 115asked

115. Deputy Eugene Murphy asked the Taoiseach and Minister for Defence the reason the military medals for gallantry and distinguished service for 29 soldiers at the siege of Jadotville as committed to previously have not been presented; when the medals will be presented; and if he will make a statement on the matter. [4366/19]

Ireland · Dáil Éireann · 29 January 2019

115. Deputy Eugene Murphy asked the Taoiseach and Minister for Defence the reason the military medals for gallantry and distinguished service for 29 soldiers at the siege of Jadotville as committed to previously have not been presented; when the medals will be presented; and if he will make a statement on the matter. [4366/19]

Question· writtenPQ 190asked

190. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine the level of preparatory work which has been carried out in relation to the reform of CAP 2020; the control national governments will have in the reformed scheme; if there will be a move away from compliance to take account of more local realities to help create more sustainable farming for persons in rural areas; and if he will make a statement on the matter. [3277/19]

Ireland · Dáil Éireann · 23 January 2019

190. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine the level of preparatory work which has been carried out in relation to the reform of CAP 2020; the control national governments will have in the reformed scheme; if there will be a move away from compliance to take account of more local realities to help create more sustainable farming for persons in rural areas; and if he will make a statement on the matter. [3277/19]

Question· writtenPQ 189asked

189. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine the number of participants in the young farmers scheme for 2017 and 2018, per county in tabular form; if there are proposed changes planned to streamline the terms and conditions of this scheme for 2019; and if he will make a statement on the matter. [3276/19]

Ireland · Dáil Éireann · 23 January 2019

189. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine the number of participants in the young farmers scheme for 2017 and 2018, per county in tabular form; if there are proposed changes planned to streamline the terms and conditions of this scheme for 2019; and if he will make a statement on the matter. [3276/19]

Question· writtenPQ 188asked

188. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine the amount of funding allocated for the new beef environmental economic pilot scheme in 2019; and if he will make a statement on the matter. [3275/19]

Ireland · Dáil Éireann · 23 January 2019

188. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine the amount of funding allocated for the new beef environmental economic pilot scheme in 2019; and if he will make a statement on the matter. [3275/19]

Question· writtenPQ 187asked

187. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine if the same compliance requirements in relation to CAP will apply to the new beef environmental economic pilot scheme in view of the fact it is an incentive for suckler farmers; and if he will make a statement on the matter. [3274/19]

Ireland · Dáil Éireann · 23 January 2019

187. Deputy Eugene Murphy asked the Minister for Agriculture, Food and the Marine if the same compliance requirements in relation to CAP will apply to the new beef environmental economic pilot scheme in view of the fact it is an incentive for suckler farmers; and if he will make a statement on the matter. [3274/19]

Question· writtenPQ 315asked

315. Deputy Eugene Murphy asked the Minister for Health if the €9 million for a replacement 50 bed unit at the Sacred Heart Hospital, County Roscommon, has been ring-fenced; if the design team has been approved; if the project is still included in the HSE capital plan 2017 to 2021; the status of the project; and if he will make a statement on the matter. [2362/19]

Ireland · Dáil Éireann · 22 January 2019

315. Deputy Eugene Murphy asked the Minister for Health if the €9 million for a replacement 50 bed unit at the Sacred Heart Hospital, County Roscommon, has been ring-fenced; if the design team has been approved; if the project is still included in the HSE capital plan 2017 to 2021; the status of the project; and if he will make a statement on the matter. [2362/19]

Question· writtenPQ 1134asked

1134. Deputy Eugene Murphy asked the Minister for Housing, Planning and Local Government if three houses (details supplied) are currently under the ownership of Galway County Council; if so, the reason the properties have not been made available to families on the social housing list in view of the level of homelessness in Galway city and county; and if he will make a statement on the matter. [54343/18]

Ireland · Dáil Éireann · 15 January 2019

1134. Deputy Eugene Murphy asked the Minister for Housing, Planning and Local Government if three houses (details supplied) are currently under the ownership of Galway County Council; if so, the reason the properties have not been made available to families on the social housing list in view of the level of homelessness in Galway city and county; and if he will make a statement on the matter. [54343/18]

Question· writtenPQ 605asked

605. Deputy Eugene Murphy asked the Minister for Health if the unpaid internship operated by an organisation (details supplied) relating to pharmacy students will be re-examined; if a paid internship will be reintroduced; and if he will make a statement on the matter. [54324/18]

Ireland · Dáil Éireann · 15 January 2019

605. Deputy Eugene Murphy asked the Minister for Health if the unpaid internship operated by an organisation (details supplied) relating to pharmacy students will be re-examined; if a paid internship will be reintroduced; and if he will make a statement on the matter. [54324/18]

Question· writtenPQ 370asked

370. Deputy Eugene Murphy asked the Minister for Education and Skills his plans to ensure that a school (details supplied) retains its third mainstream classroom teacher in September 2019 due to extenuating circumstances; and if he will make a statement on the matter. [1347/19]

Ireland · Dáil Éireann · 15 January 2019

370. Deputy Eugene Murphy asked the Minister for Education and Skills his plans to ensure that a school (details supplied) retains its third mainstream classroom teacher in September 2019 due to extenuating circumstances; and if he will make a statement on the matter. [1347/19]

Question· writtenPQ 471asked

471. Deputy Eugene Murphy asked the Minister for Communications, Climate Action and Environment the amount of electricity generated each year by each of the dams here; the percentage of the electricity requirement that comes from each of the dams operational here; and if he will make a statement on the matter. [53785/18]

Ireland · Dáil Éireann · 19 December 2018

471. Deputy Eugene Murphy asked the Minister for Communications, Climate Action and Environment the amount of electricity generated each year by each of the dams here; the percentage of the electricity requirement that comes from each of the dams operational here; and if he will make a statement on the matter. [53785/18]

Question· writtenPQ 205asked

205. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Whitechurch, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53819/18]

Ireland · Dáil Éireann · 19 December 2018

205. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Whitechurch, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53819/18]

Question· writtenPQ 204asked

204. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Skerries, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53818/18]

Ireland · Dáil Éireann · 19 December 2018

204. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Skerries, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53818/18]

Question· writtenPQ 203asked

203. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Sandymount, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53817/18]

Ireland · Dáil Éireann · 19 December 2018

203. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Sandymount, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53817/18]

Question· writtenPQ 202asked

202. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Raphoe, County Donegal; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53816/18]

Ireland · Dáil Éireann · 19 December 2018

202. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Raphoe, County Donegal; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53816/18]

Question· writtenPQ 201asked

201. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Portarlington, County Laois; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53815/18]

Ireland · Dáil Éireann · 19 December 2018

201. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Portarlington, County Laois; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53815/18]

Question· writtenPQ 200asked

200. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for the River Poddle, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53814/18]

Ireland · Dáil Éireann · 19 December 2018

200. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for the River Poddle, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53814/18]

Question· writtenPQ 199asked

199. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Mountmellick, County Laois; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53813/18]

Ireland · Dáil Éireann · 19 December 2018

199. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Mountmellick, County Laois; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53813/18]

Question· writtenPQ 198asked

198. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Midleton, County Cork; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53812/18]

Ireland · Dáil Éireann · 19 December 2018

198. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Midleton, County Cork; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53812/18]

Question· writtenPQ 197asked

197. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for lower Morrell, County Kildare; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53811/18]

Ireland · Dáil Éireann · 19 December 2018

197. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for lower Morrell, County Kildare; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53811/18]

Question· writtenPQ 196asked

196. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for lower Lee, Cork city; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53810/18]

Ireland · Dáil Éireann · 19 December 2018

196. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for lower Lee, Cork city; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53810/18]

Question· writtenPQ 195asked

195. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for King’s Island, County Limerick; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53809/18]

Ireland · Dáil Éireann · 19 December 2018

195. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for King’s Island, County Limerick; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53809/18]

Question· writtenPQ 194asked

194. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Gort lowlands, County Galway; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53808/18]

Ireland · Dáil Éireann · 19 December 2018

194. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Gort lowlands, County Galway; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53808/18]

Question· writtenPQ 193asked

193. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Glanmire and Glashaboy, County Cork; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53807/18]

Ireland · Dáil Éireann · 19 December 2018

193. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Glanmire and Glashaboy, County Cork; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53807/18]

Question· writtenPQ 192asked

192. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Enniscorthy, County Wexford; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53806/18]

Ireland · Dáil Éireann · 19 December 2018

192. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Enniscorthy, County Wexford; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53806/18]

Question· writtenPQ 191asked

191. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Ennis south, County Clare; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53805/18]

Ireland · Dáil Éireann · 19 December 2018

191. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Ennis south, County Clare; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53805/18]

Question· writtenPQ 190asked

190. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence schemes for Douglas and Togher, County Cork; when the schemes will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53804/18]

Ireland · Dáil Éireann · 19 December 2018

190. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence schemes for Douglas and Togher, County Cork; when the schemes will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53804/18]

Question· writtenPQ 189asked

189. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Crossmolina, County Mayo; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53803/18]

Ireland · Dáil Éireann · 19 December 2018

189. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Crossmolina, County Mayo; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53803/18]

Question· writtenPQ 188asked

188. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if consultants have been appointed for the flood defence scheme for the River Camac, Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53802/18]

Ireland · Dáil Éireann · 19 December 2018

188. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if consultants have been appointed for the flood defence scheme for the River Camac, Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53802/18]

Question· writtenPQ 187asked

187. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme for Blackpool, County Cork, has been submitted to his Department for confirmation; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53801/18]

Ireland · Dáil Éireann · 19 December 2018

187. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme for Blackpool, County Cork, has been submitted to his Department for confirmation; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53801/18]

Question· writtenPQ 186asked

186. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme planned for Bellurgan, County Louth, has been completed in 2018; if not, when it will be completed; and if he will make a statement on the matter. [53800/18]

Ireland · Dáil Éireann · 19 December 2018

186. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme planned for Bellurgan, County Louth, has been completed in 2018; if not, when it will be completed; and if he will make a statement on the matter. [53800/18]

Question· writtenPQ 185asked

185. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the environmental impact statement has been completed for the flood defence scheme in Arklow, County Wicklow; if surveying has been completed in respect of the wastewater treatment plant; if all reports have been completed; if planning permission has been sought; and if he will make a statement on the matter. [53799/18]

Ireland · Dáil Éireann · 19 December 2018

185. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the environmental impact statement has been completed for the flood defence scheme in Arklow, County Wicklow; if surveying has been completed in respect of the wastewater treatment plant; if all reports have been completed; if planning permission has been sought; and if he will make a statement on the matter. [53799/18]

Question· writtenPQ 184asked

184. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if phases 2 and 3 of the flood defence scheme for the River Wad, Dublin city, have been completed; if not, when these phases will be completed; when the entire flood defence scheme will be completed; and if he will make a statement on the matter. [53798/18]

Ireland · Dáil Éireann · 19 December 2018

184. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if phases 2 and 3 of the flood defence scheme for the River Wad, Dublin city, have been completed; if not, when these phases will be completed; when the entire flood defence scheme will be completed; and if he will make a statement on the matter. [53798/18]