Records

Question· writtenPQ 205asked

205. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Whitechurch, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53819/18]

Ireland · Dáil Éireann · 19 December 2018

205. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Whitechurch, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53819/18]

Question· writtenPQ 204asked

204. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Skerries, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53818/18]

Ireland · Dáil Éireann · 19 December 2018

204. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Skerries, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53818/18]

Question· writtenPQ 203asked

203. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Sandymount, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53817/18]

Ireland · Dáil Éireann · 19 December 2018

203. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Sandymount, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53817/18]

Question· writtenPQ 202asked

202. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Raphoe, County Donegal; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53816/18]

Ireland · Dáil Éireann · 19 December 2018

202. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Raphoe, County Donegal; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53816/18]

Question· writtenPQ 201asked

201. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Portarlington, County Laois; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53815/18]

Ireland · Dáil Éireann · 19 December 2018

201. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Portarlington, County Laois; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53815/18]

Question· writtenPQ 200asked

200. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for the River Poddle, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53814/18]

Ireland · Dáil Éireann · 19 December 2018

200. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for the River Poddle, County Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53814/18]

Question· writtenPQ 199asked

199. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Mountmellick, County Laois; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53813/18]

Ireland · Dáil Éireann · 19 December 2018

199. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Mountmellick, County Laois; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53813/18]

Question· writtenPQ 198asked

198. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Midleton, County Cork; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53812/18]

Ireland · Dáil Éireann · 19 December 2018

198. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Midleton, County Cork; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53812/18]

Question· writtenPQ 197asked

197. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for lower Morrell, County Kildare; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53811/18]

Ireland · Dáil Éireann · 19 December 2018

197. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for lower Morrell, County Kildare; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53811/18]

Question· writtenPQ 196asked

196. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for lower Lee, Cork city; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53810/18]

Ireland · Dáil Éireann · 19 December 2018

196. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for lower Lee, Cork city; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53810/18]

Question· writtenPQ 195asked

195. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for King’s Island, County Limerick; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53809/18]

Ireland · Dáil Éireann · 19 December 2018

195. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for King’s Island, County Limerick; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53809/18]

Question· writtenPQ 194asked

194. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Gort lowlands, County Galway; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53808/18]

Ireland · Dáil Éireann · 19 December 2018

194. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Gort lowlands, County Galway; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53808/18]

Question· writtenPQ 193asked

193. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Glanmire and Glashaboy, County Cork; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53807/18]

Ireland · Dáil Éireann · 19 December 2018

193. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Glanmire and Glashaboy, County Cork; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53807/18]

Question· writtenPQ 192asked

192. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Enniscorthy, County Wexford; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53806/18]

Ireland · Dáil Éireann · 19 December 2018

192. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Enniscorthy, County Wexford; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53806/18]

Question· writtenPQ 191asked

191. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Ennis south, County Clare; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53805/18]

Ireland · Dáil Éireann · 19 December 2018

191. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Ennis south, County Clare; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53805/18]

Question· writtenPQ 190asked

190. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence schemes for Douglas and Togher, County Cork; when the schemes will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53804/18]

Ireland · Dáil Éireann · 19 December 2018

190. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence schemes for Douglas and Togher, County Cork; when the schemes will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53804/18]

Question· writtenPQ 189asked

189. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Crossmolina, County Mayo; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53803/18]

Ireland · Dáil Éireann · 19 December 2018

189. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Crossmolina, County Mayo; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53803/18]

Question· writtenPQ 188asked

188. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if consultants have been appointed for the flood defence scheme for the River Camac, Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53802/18]

Ireland · Dáil Éireann · 19 December 2018

188. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if consultants have been appointed for the flood defence scheme for the River Camac, Dublin; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53802/18]

Question· writtenPQ 187asked

187. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme for Blackpool, County Cork, has been submitted to his Department for confirmation; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53801/18]

Ireland · Dáil Éireann · 19 December 2018

187. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme for Blackpool, County Cork, has been submitted to his Department for confirmation; when the scheme will be commenced; the specific projects to be commenced; the associated cost and completion dates for each project; and if he will make a statement on the matter. [53801/18]

Question· writtenPQ 186asked

186. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme planned for Bellurgan, County Louth, has been completed in 2018; if not, when it will be completed; and if he will make a statement on the matter. [53800/18]

Ireland · Dáil Éireann · 19 December 2018

186. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme planned for Bellurgan, County Louth, has been completed in 2018; if not, when it will be completed; and if he will make a statement on the matter. [53800/18]

Question· writtenPQ 185asked

185. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the environmental impact statement has been completed for the flood defence scheme in Arklow, County Wicklow; if surveying has been completed in respect of the wastewater treatment plant; if all reports have been completed; if planning permission has been sought; and if he will make a statement on the matter. [53799/18]

Ireland · Dáil Éireann · 19 December 2018

185. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the environmental impact statement has been completed for the flood defence scheme in Arklow, County Wicklow; if surveying has been completed in respect of the wastewater treatment plant; if all reports have been completed; if planning permission has been sought; and if he will make a statement on the matter. [53799/18]

Question· writtenPQ 184asked

184. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if phases 2 and 3 of the flood defence scheme for the River Wad, Dublin city, have been completed; if not, when these phases will be completed; when the entire flood defence scheme will be completed; and if he will make a statement on the matter. [53798/18]

Ireland · Dáil Éireann · 19 December 2018

184. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if phases 2 and 3 of the flood defence scheme for the River Wad, Dublin city, have been completed; if not, when these phases will be completed; when the entire flood defence scheme will be completed; and if he will make a statement on the matter. [53798/18]

Question· writtenPQ 182asked

182. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme for south Campshires in Dublin city has been completed; and if he will make a statement on the matter. [53796/18]

Ireland · Dáil Éireann · 19 December 2018

182. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme for south Campshires in Dublin city has been completed; and if he will make a statement on the matter. [53796/18]

Question· writtenPQ 181asked

181. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme for Northlands, County Meath, has been completed; and if he will make a statement on the matter. [53795/18]

Ireland · Dáil Éireann · 19 December 2018

181. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if the flood defence scheme for Northlands, County Meath, has been completed; and if he will make a statement on the matter. [53795/18]

Question· writtenPQ 180asked

180. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the specific projects undertaken since 2016 on the Templemore flood defence scheme in County Tipperary; the amount spent in 2016, 2017 and to date in 2018 on the scheme; the specific projects planned for 2019; the associated cost of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53794/18]

Ireland · Dáil Éireann · 19 December 2018

180. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the specific projects undertaken since 2016 on the Templemore flood defence scheme in County Tipperary; the amount spent in 2016, 2017 and to date in 2018 on the scheme; the specific projects planned for 2019; the associated cost of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53794/18]

Question· writtenPQ 179asked

179. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the specific projects undertaken since 2016 on the Skibbereen flood defence scheme; the amount spent in 2016, 2017 and to date in 2018 on the scheme; the specific projects planned for 2019; the associated cost of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53793/18]

Ireland · Dáil Éireann · 19 December 2018

179. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the specific projects undertaken since 2016 on the Skibbereen flood defence scheme; the amount spent in 2016, 2017 and to date in 2018 on the scheme; the specific projects planned for 2019; the associated cost of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53793/18]

Question· writtenPQ 178asked

178. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for the Ennis lower, County Clare; the specific projects planned under the scheme; the cost and completion date of each project; the projects to be commenced in 2019; the associated cost and completion dates of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53792/18]

Ireland · Dáil Éireann · 19 December 2018

178. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for the Ennis lower, County Clare; the specific projects planned under the scheme; the cost and completion date of each project; the projects to be commenced in 2019; the associated cost and completion dates of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53792/18]

Question· writtenPQ 177asked

177. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the specific projects undertaken since 2016 on the Dunkellin flood defence scheme; the amount spent in 2016, 2017 and to date in 2018 on the scheme; the specific projects planned for 2019; the associated cost of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53791/18]

Ireland · Dáil Éireann · 19 December 2018

177. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the specific projects undertaken since 2016 on the Dunkellin flood defence scheme; the amount spent in 2016, 2017 and to date in 2018 on the scheme; the specific projects planned for 2019; the associated cost of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53791/18]

Question· writtenPQ 176asked

176. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for the Dodder fluvial phase 2c, 2d and 2e for Dublin city; the specific projects planned under the scheme; the cost and completion date of each project; the projects to be commenced in 2019; the associated cost and completion dates of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53790/18]

Ireland · Dáil Éireann · 19 December 2018

176. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for the Dodder fluvial phase 2c, 2d and 2e for Dublin city; the specific projects planned under the scheme; the cost and completion date of each project; the projects to be commenced in 2019; the associated cost and completion dates of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53790/18]

Question· writtenPQ 175asked

175. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Clonakilty, County Cork; the specific projects planned under the scheme; the cost and completion date of each project; the projects to be commenced in 2019; the associated cost and completion dates of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53789/18]

Ireland · Dáil Éireann · 19 December 2018

175. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the progress of the flood defence scheme for Clonakilty, County Cork; the specific projects planned under the scheme; the cost and completion date of each project; the projects to be commenced in 2019; the associated cost and completion dates of those projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53789/18]

Question· writtenPQ 174asked

174. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the specific projects undertaken since 2016 on the Claregalway flood defence scheme; the amount spent in 2016, 2017 and to date in 2018 on the scheme; the specific projects planned for 2019; the associated cost of these projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53788/18]

Ireland · Dáil Éireann · 19 December 2018

174. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the specific projects undertaken since 2016 on the Claregalway flood defence scheme; the amount spent in 2016, 2017 and to date in 2018 on the scheme; the specific projects planned for 2019; the associated cost of these projects; when the overall scheme will be completed; and if he will make a statement on the matter. [53788/18]

Question· writtenPQ 173asked

173. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if work has been completed on Bandon Bridge as part of the Office of Public Works flood defence scheme; if not, when the work will be completed; when work will be completed on flood defence walls and the embankment for Bandon; when the overall scheme for Bandon will be completed; and if he will make a statement on the matter. [53787/18]

Ireland · Dáil Éireann · 19 December 2018

173. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform if work has been completed on Bandon Bridge as part of the Office of Public Works flood defence scheme; if not, when the work will be completed; when work will be completed on flood defence walls and the embankment for Bandon; when the overall scheme for Bandon will be completed; and if he will make a statement on the matter. [53787/18]

Question· writtenPQ 172asked

172. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the amount spent by the Office of Public Works and Westmeath County Council on flood defences for Athlone in 2017 and to date in 2018; the projects completed in that time; the flood defence projects planned for 2019; the moneys allocated; when construction will be commenced; when each project will be completed; when the overall scheme for Athlone will be completed; and if he will make a statement on the matter. [53786/18]

Ireland · Dáil Éireann · 19 December 2018

172. Deputy Eugene Murphy asked the Minister for Public Expenditure and Reform the amount spent by the Office of Public Works and Westmeath County Council on flood defences for Athlone in 2017 and to date in 2018; the projects completed in that time; the flood defence projects planned for 2019; the moneys allocated; when construction will be commenced; when each project will be completed; when the overall scheme for Athlone will be completed; and if he will make a statement on the matter. [53786/18]

Question· writtenPQ 105asked

105. Deputy Barry Cowen asked the Taoiseach and Minister for Defence the amount spent on marketing and media by his Department in 2016, 2017 and to date in 2018; the projected spend in 2019; and if he will make a statement on the matter. [54004/18]

Ireland · Dáil Éireann · 19 December 2018

105. Deputy Barry Cowen asked the Taoiseach and Minister for Defence the amount spent on marketing and media by his Department in 2016, 2017 and to date in 2018; the projected spend in 2019; and if he will make a statement on the matter. [54004/18]

Question· writtenPQ 104asked

104. Deputy Barry Cowen asked the Taoiseach and Minister for Defence the amount spent on social media by his Department in 2016, 2017 and to date in 2018; the projected spend in 2019; and if he will make a statement on the matter. [53987/18]

Ireland · Dáil Éireann · 19 December 2018

104. Deputy Barry Cowen asked the Taoiseach and Minister for Defence the amount spent on social media by his Department in 2016, 2017 and to date in 2018; the projected spend in 2019; and if he will make a statement on the matter. [53987/18]

Question· writtenPQ 99asked

99. Deputy Jack Chambers asked the Taoiseach and Minister for Defence the number of additional recruits the Reserve Defence Force has taken on to date in 2018 with regard to all services; the gender breakdown of same; and if he will make a statement on the matter. [53706/18]

Ireland · Dáil Éireann · 19 December 2018

99. Deputy Jack Chambers asked the Taoiseach and Minister for Defence the number of additional recruits the Reserve Defence Force has taken on to date in 2018 with regard to all services; the gender breakdown of same; and if he will make a statement on the matter. [53706/18]

Question· writtenPQ 98asked

98. Deputy Jack Chambers asked the Taoiseach and Minister for Defence the number of additional recruits the Permanent Defence Force has taken on to date in 2018 with regard to all three services; the gender breakdown of same; and if he will make a statement on the matter. [53705/18]

Ireland · Dáil Éireann · 19 December 2018

98. Deputy Jack Chambers asked the Taoiseach and Minister for Defence the number of additional recruits the Permanent Defence Force has taken on to date in 2018 with regard to all three services; the gender breakdown of same; and if he will make a statement on the matter. [53705/18]

Question· writtenPQ 97asked

97. Deputy Jack Chambers asked the Taoiseach and Minister for Defence the strength of the Reserve Defence Force with regard to all three services and all ranks; the gender breakdown of same; and if he will make a statement on the matter. [53704/18]

Ireland · Dáil Éireann · 19 December 2018

97. Deputy Jack Chambers asked the Taoiseach and Minister for Defence the strength of the Reserve Defence Force with regard to all three services and all ranks; the gender breakdown of same; and if he will make a statement on the matter. [53704/18]

Question· writtenPQ 96asked

96. Deputy Jack Chambers asked the Taoiseach and Minister for Defence the strength of the Permanent Defence Force with regard to all three services and all ranks; the gender breakdown of same; and if he will make a statement on the matter. [53703/18]

Ireland · Dáil Éireann · 19 December 2018

96. Deputy Jack Chambers asked the Taoiseach and Minister for Defence the strength of the Permanent Defence Force with regard to all three services and all ranks; the gender breakdown of same; and if he will make a statement on the matter. [53703/18]

Question· writtenPQ 95asked

95. Deputy Niamh Smyth asked the Taoiseach and Minister for Defence his plans to introduce a new Army barracks in counties Cavan and Monaghan or the greater Border region in view of Brexit and in further view of recent developments and the possible reintroduction of a hard border; if such a move is included in contingency plans; and if he will make a statement on the matter. [53592/18]

Ireland · Dáil Éireann · 19 December 2018

95. Deputy Niamh Smyth asked the Taoiseach and Minister for Defence his plans to introduce a new Army barracks in counties Cavan and Monaghan or the greater Border region in view of Brexit and in further view of recent developments and the possible reintroduction of a hard border; if such a move is included in contingency plans; and if he will make a statement on the matter. [53592/18]

Question· writtenPQ 94asked

94. Deputy Brendan Howlin asked the Taoiseach and Minister for Defence the amount spent by his Department on public advertising and the purchase of external communications and publicity in 2018 by advertising campaign, including specific amounts on social media campaigns (details supplied) or other digital platforms; the amount spent on public relations or other communications support in tabular form; and if he will make a statement on the matter. [53573/18]

Ireland · Dáil Éireann · 19 December 2018

94. Deputy Brendan Howlin asked the Taoiseach and Minister for Defence the amount spent by his Department on public advertising and the purchase of external communications and publicity in 2018 by advertising campaign, including specific amounts on social media campaigns (details supplied) or other digital platforms; the amount spent on public relations or other communications support in tabular form; and if he will make a statement on the matter. [53573/18]

Question· oralPQ 50asked

50. Deputy Joan Burton asked the Minister for Employment Affairs and Social Protection the number of civil and public servants, respectively, in receipt of the working family payment; the number of payments made and estimated amounts paid in 2017 and to date in 2018; and the number of payments made in respect of members of the Defence Forces in 2017 and to date in 2018. [49208/18]

Ireland · Dáil Éireann · 19 December 2018

50. Deputy Joan Burton asked the Minister for Employment Affairs and Social Protection the number of civil and public servants, respectively, in receipt of the working family payment; the number of payments made and estimated amounts paid in 2017 and to date in 2018; and the number of payments made in respect of members of the Defence Forces in 2017 and to date in 2018. [49208/18]

Question· writtenPQ 120asked

120. Deputy Jack Chambers asked the Taoiseach and Minister for Defence further to Parliamentary Question No. 123 of 6 November 2018, when a reply will issue; and if he will make a statement on the matter. [53040/18]

Ireland · Dáil Éireann · 18 December 2018

120. Deputy Jack Chambers asked the Taoiseach and Minister for Defence further to Parliamentary Question No. 123 of 6 November 2018, when a reply will issue; and if he will make a statement on the matter. [53040/18]