United States · Bill · HR
H.R. 102 (99th)
A bill to authorize construction of a dam on the Pearl River in the vicinity of Shoccoe, Mississippi, for the purpose of providing flood control for Jackson, Columbia, Monticello, Georgetown, and points downstream from Jackson, Mississippi in the Pearl River Basin.
Introduced
3 January 1985
Last action
—
Status
See H.R.6.
Sponsors
—
Subjects
Discovery layer
Source updated
7 February 2024
Summary
Authorizes and directs the Secretary of the Army, acting through the Chief of Engineers, to design and construct a flood retarding dam at full Federal expense on the Pearl River in the vicinity of Shoccoe, Mississippi. Requires non-Federal interests to agree, prior to construction of the dam, to: (1) hold the United States free from damages due to the construction and operation of the dam; and (2) operate and maintain the dam in accordance with regulations prescribed by the Secretary.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in House
summary · EN · 3 January 1985
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/99th-congress/house-bill/102
- Open data entity: https://api.congress.gov/v3/bill/99/hr/102