United States · Bill · HR
H.R. 15636 (94th)
A bill authorizing the construction, repair, and preservation of certain public works on rivers and harbors for navigation, flood control.
Introduced
20 September 1976
Last action
—
Status
Measure laid on table in House, S. 3823 passed in lieu.
Sponsors
—
Subjects
Discovery layer
Source updated
1 August 2024
Summary
Title I: Water Resources Development - Water Resources Development Act - Authorizes the Secretary of the Army, acting through the Chief of Engineers, to initiate advanced engineering and design of the following water resources development projects, for the following estimated costs as listed: (1) for water supply in the Millers River Basin (Massachusetts), $1,200,000; (2) for water supply at Northfield and Ewing (Massachusetts), $1,300,000; (2) for beach erosion control, navigation, and storm protection from Hereford Inlet to Cape May Canal (New Jersey), $2,062;000; (4) for beach erosion control, navigation, and storm protection from Barnegat Inlet to Longport (New Jersey), $2,396,000; (5) for flood control of the Wallkill River (New Jersey, New York), $330,000; (6) for flood control in the Pasaic River Basin (New Jersey, New York), $12,000,000; (7) for flood control at Lock Haven (Pennyslvania), $430,000; (8) for flood control at Wyoming Valley (Pennsylvania), $450,000; (9) for flood control at Richmond (Virginia), $800,000; (10) for flood control at the Richmond filtration plant (Virginia), $100,000; (11) for navigation at Brunswick Harbor (Georgia), $300,000; (12) for navigation improvements at Charleston Harbor (South Carolina), $500,000; (13) for navigation improvements at San Juan Harbor (Puerto Rico), $300,000; (14) for local flood protection and purposes at Laf Crosse (Wisconsin), $400,000; (15) for beach erosion control for Presque Isle Penninsula (Pennsylvania), $700,000; (16) for flood control and other purposes at Little Calumet River (Indiana), $1,400,000; (17) for flood protection for St. Johns Bayou and New Madrid Floodway (Missouri), $300,000; (18) for flood protection for Noneconnah Creek (Mississippi, Tennessee), $400,000; (19) for natural salt pollution control in the Brazos River (Texas) $650,000; (20) for flood control and other purposes on the Rio Puerco and Rio Salado (New Mexico), $1,500,000; (21) for flood protection on Wears Creek (Missouri), $50,000; (22) for construction and installation of additional facilities at McNary Lock and Dam (Oregon, Washington), $1,800,000; (23) for flood control and other purposes on Calleguas Creek (California), $1,060,000; and (24) for flood control and other purposes on Morrison Creek Stream Group (California), $750,000. Authorizes the appropriation of an additional $5,000,000 for administrative costs of preparing additional reports to Congress prior to commencement of final engineering and design activities. Authorizes the appropriation of $4,000,000 per fiscal year for fiscal years 1978 and 1979 for the preparation of additional initial engineering and design studies for future projects. Authorizes the prosecution of the following projects, at the following estimated costs as listed, in accordance with requirements of the Flood Control Act of 1968: (1) for navigation improvements in New London Harbor and Thames River (Connecticut), $8,022,000; (2) for local flood protection and other purposes on the Minnesota River (Chaska, Minnesota), $10,498,000; (3) for local flood protection on the Park River (Grafton, North Dakota), $10,973,000; (4) for flood control for Harris Fork Creek (Kentucky, Tennessee), $5,000,000 (5) for flood control and other purposes on the Red River (Arkansas, Louisiana), $4,401,000; (6) for salt water control on the Neches River and Tributaries (Texas), $14,300,000; and (7) for navigation in the Los Angeles, Long Beach Harbors (California), $16,580,000. Title II: River Basin Monetary Authorizations - Authorizes appropriations for fiscal year 1978 for the following comprehensive river basin development programs, as listed: (1) Alabama-Coosa River Basin $7,000,000; (2) Arkansas River Basin $5,000,000; (3) Brazos River Basin $28,000,000; (4) Columbia River Basin $19,000,000; (5) Mississippi River and tributaries $263,000,000; (6) Missouri River Basin $101,000,000; (7) North Branch Susquehanna River Basin $36,000,000; (8) Ohio River Basin $31,000,000; (9) Ouachita River Basin $1,000,000; (10) Red River Waterway project $22,000,000; (11) San Joaquin River Basin $69,000,000; and (12) South Platte River Basin $8,000,000. Stipulates that the total amount of such authorizations shall not exceed $590,000,000.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
2 official files
Reported to House with amendment(s)
summary · EN · 27 September 1976
Introduced in House
summary · EN · 20 September 1976
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/94th-congress/house-bill/15636
- Open data entity: https://api.congress.gov/v3/bill/94/hr/15636