United States · Bill · HR
H.R. 15785 (94th)
A bill to provide for reimbursement of consumers of electricity generated by nuclear power for certain costs associated with the premature design and premature approval, and for other unanticipated costs, of nuclear powerplants.
Introduced
30 September 1976
Last action
—
Status
Referred to Joint Committee on Atomic Energy.
Sponsors
—
Subjects
Discovery layer
Source updated
1 August 2024
Summary
Directs the Nuclear Regulatory Commission to reimburse electric utility rate payers on a pro-rata basis for costs associated with design changes and downtime with respect to nuclear powerplants as determined by a General Accounting Office report. Requires the General Accounting Office to report to Congress and the Commission with respect to such costs.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in House
summary · EN · 30 September 1976
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/94th-congress/house-bill/15785
- Open data entity: https://api.congress.gov/v3/bill/94/hr/15785