H.R. 2828 (115th)

To extend the deadline for commencement of construction of a hydroelectric project.

referredUnited States· United States Congress· EN

Introduced

8 June 2017

Last action

Status

Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources.

Sponsors

Subjects

Discovery layer

Source updated

24 March 2026

Summary

This bill requires the Federal Energy Regulatory Commission (FERC), upon request, to extend for up to six years the time period during which construction must commence on the Enloe Hydroelectric Project located on the Similkameen River in Okanogan County, Washington. Additionally, FERC shall reinstate the construction license if it is expired.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

No timeline events have been ingested for this record yet.

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

8 official files

Referred in Senate (text)

View fileDownload file

Sponsors

No sponsors or actors listed by the source.

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.