United States · Bill · HR
H.R. 3155 (98th)
A bill to authorize construction of an interim plan for flood control at Jackson, Mississippi.
Introduced
26 May 1983
Last action
—
Status
Executive Comment Requested from Army, OMB.
Sponsors
—
Subjects
Discovery layer
Source updated
7 February 2024
Summary
Authorizes and directs the Secretary of the Army, acting through the Chief of Engineers, to design and construct flood protection works at Jackson, Mississippi, consisting of: (1) a river bend cutoff; (2) floodway clearing; (3) modifications to the Ross Barnett Dam; and (4) certain improvements at Mississippi highway 25 bridge. Directs that certain funds expended by the Pearl River basin development district be credited toward the local share of project costs. Requires that non-Federal interests agree to: (1) hold and save the United States free from damages due to the construction of such project (not due to negligence on the part of the United States or its contractors); (2) provide without cost to the United States all necessary lands, easements, rights-of-way and utility relocations; and (3) operate and maintain such project in accordance with certain regulations.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in House
summary · EN · 26 May 1983
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/98th-congress/house-bill/3155
- Open data entity: https://api.congress.gov/v3/bill/98/hr/3155