United States · Bill · HR
H.R. 3163 (111th)
To establish certain requirements relating to area mail processing studies.
Introduced
9 July 2009
Last action
—
Status
Referred to the Subcommittee on Federal Workforce, Post Office, and the District of Columbia.
Sponsors
—
Subjects
Discovery layer
Source updated
4 February 2025
Summary
Makes the results of an AMP study (an area mail processing study relating to consolidating the operations of two or more postal facilities) noncognizable for any purpose unless specified time limit and notice requirements are met. Requires the U.S. Postal Service to ensure that no reduction in the workforce of, and no removal of equipment from, any postal facility occurs while an AMP study regarding that facility is pending. Applies this Act to AMP studies started on or after enactment and to studies pending at enactment of this Act.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Introduced in House (text)
Introduced in House (text)
Introduced in House · EN · 9 July 2009
Introduced in House (PDF)
Introduced in House · EN · 9 July 2009
Introduced in House
summary · EN · 9 July 2009
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/111th-congress/house-bill/3163
- Open data entity: https://api.congress.gov/v3/bill/111/hr/3163