United States · Bill · HR
H.R. 4481 (107th)
Airport Streamlining Approval Process Act of 2002
Introduced
18 April 2002
Last action
—
Status
Received in the Senate and Read twice and referred to the Committee on Commerce, Science, and Transportation.
Sponsors
—
Subjects
Discovery layer
Source updated
7 April 2025
Summary
Airport Streamlining Approval Process Act of 2002 - Amends Federal transportation law to direct the Administrator of the Federal Aviation Administration (FAA) to take action to encourage the construction of airport capacity enhancement projects at congested airports. Directs the Secretary of Transportation to develop and implement a coordinated review process for such projects, which shall provide that all environmental reviews, analyses, opinions, permits, licenses, and approvals that must be issued or made by a Federal agency or airport sponsor for such a project will be conducted concurrently in cooperation with specified Federal and State environmental agencies. Authorizes the Secretary, at the request of an airport sponsor for a congested airport, to approve a restriction on use of a runway to be constructed at the airport to minimize potentially significant adverse noise impacts from the runway, if certain criteria are met. Authorizes the Secretary, in specified circumstances, to allow an airport sponsor carrying out such a project to make payments, out of airport revenues (including local taxes on aviation fuel), for measures to mitigate the environmental impacts of the project, including aircraft noise. Permits the FAA Administrator to accept funds from an airport sponsor to hire additional staff or obtain the services of consultants in order to facilitate the timely processing, review, and completion of environmental activities associated with an airport development project. Repeals the requirement that the Secretary approve a project grant application only if the chief executive officer of the State in which the project will be located certifies that there is reasonable assurance that the project will be located, designed, constructed, and operated in compliance with applicable air and water quality standards. Revises the approval criteria without the requirement of an environmental impact statement for an airport development project that does not involve the location of an airport or runway, or a major runway extension, at an existing airport. Allows such a project without an environmental impact statement if completing the project would allow airport operations involving aircraft complying with the noise standards prescribed for "stage 3" aircraft (currently "stage 2" aircraft).
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
11 official files
Referred in Senate (text)
Referred in Senate (text)
Referred in Senate · EN · 11 July 2002
Referred in Senate (PDF)
Referred in Senate · EN · 11 July 2002
Engrossed in House (text)
Engrossed in House · EN · 9 July 2002
Engrossed in House (PDF)
Engrossed in House · EN · 9 July 2002
Passed House amended
summary · EN · 9 July 2002
Reported in House (text)
Reported in House · EN · 25 June 2002
Reported in House (PDF)
Reported in House · EN · 25 June 2002
Reported to House with amendment(s)
summary · EN · 25 June 2002
Introduced in House (text)
Introduced in House · EN · 18 April 2002
Introduced in House (PDF)
Introduced in House · EN · 18 April 2002
Introduced in House
summary · EN · 18 April 2002
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/107th-congress/house-bill/4481
- Open data entity: https://api.congress.gov/v3/bill/107/hr/4481