United States · Bill · HR
H.R. 6078 (102nd)
To require any private shipyard competing for a contract with the Department of Defense for repair, alteration, overhaul, or conversion of a naval vessel to undergo a cost realism analysis of its bid to ensure that the work can be accomplished at the estimated cost in the bid.
Introduced
1 October 1992
Last action
—
Status
Referred to the House Committee on Armed Services.
Sponsors
—
Subjects
Discovery layer
Source updated
6 June 2025
Summary
Requires bids made by public and private shipyards for defense contracts for the overhaul of naval vessels to include a cost realism analysis (an analysis of whether the work can be accomplished at the estimated cost).
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
2 official files
Introduced in House (text)
Introduced in House (text)
Introduced in House · EN
Introduced in House
summary · EN · 1 October 1992
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/102nd-congress/house-bill/6078
- Open data entity: https://api.congress.gov/v3/bill/102/hr/6078