United States · Bill · HR
H.R. 6474 (111th)
To direct the Secretary of the Army to cease construction of a temporary causeway in connection with the project for the Renard Island Confined Disposal Facility, Green Bay Harbor, Wisconsin, until certain conditions are met, and for other purposes.
Introduced
2 December 2010
Last action
—
Status
Referred to the House Committee on Transportation and Infrastructure.
Sponsors
—
Subjects
Discovery layer
Source updated
2 January 2025
Summary
Directs the Secretary of the Army, acting through the Chief of Engineers, to cease construction of a temporary causeway in connection with the project for the Renard Island Confined Disposal Facility, Green Bay Harbor, Wisconsin, until the Secretary: (1) conducts a review of all bids submitted for construction of the Renard Island Temporary Causeway, Final Cover and Grading element of such project; and (2) submits to specified congressional committees a report on the results of that review.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Introduced in House (text)
Introduced in House (text)
Introduced in House · EN · 2 December 2010
Introduced in House (PDF)
Introduced in House · EN · 2 December 2010
Introduced in House
summary · EN · 2 December 2010
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/111th-congress/house-bill/6474
- Open data entity: https://api.congress.gov/v3/bill/111/hr/6474