United States · Bill · HR
H.R. 6745 (94th)
A bill to authorize the licensing of Hualapai Dam.
Introduced
6 May 1975
Last action
—
Status
Referred to House Committee on Interior and Insular Affairs.
Sponsors
—
Subjects
Discovery layer
Source updated
1 August 2024
Summary
Authorizes the Federal Power Commission to issue a license for the construction and operation of the Huolopi Dam together with reservoir, powerplant, transmission facilities, access roads and appurtenant works. States that the Dam shall be constructed at Bridge Canyon on the Colorado River and shall provide a normal reservoir elevation of 1,610 feet for the production of hydroelectric power.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in House
summary · EN · 6 May 1975
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/94th-congress/house-bill/6745
- Open data entity: https://api.congress.gov/v3/bill/94/hr/6745