United States · Bill · HR
H.R. 9025 (117th)
Determination of NEPA Adequacy Streamlining Act
Introduced
28 September 2022
Last action
—
Status
Referred to the Subcommittee on Conservation and Forestry.
Sponsors
—
Subjects
Discovery layer
Source updated
24 January 2025
Summary
Determination of NEPA Adequacy Streamlining Act This bill requires the Department of Agriculture and the Department of the Interior to use a previously completed environmental assessment or environmental impact statement required under the National Environmental Policy Act of 1969 for a proposed transmission, pipeline, or renewable energy facility project if the proposed project is substantially the same as one addressed in the previous assessment or statement.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Introduced in House (text)
Introduced in House (text)
Introduced in House · EN · 28 September 2022
Introduced in House (PDF)
Introduced in House · EN · 28 September 2022
Introduced in House
summary · EN · 28 September 2022
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/117th-congress/house-bill/9025
- Open data entity: https://api.congress.gov/v3/bill/117/hr/9025