United States · Bill · S
S. 1139 (99th)
A bill to authorize construction of a combined Sheyenne and Maple River Flood Control Project.
Introduced
15 May 1985
Last action
—
Status
Read twice and referred to the Committee on Environment and Public Works.
Sponsors
—
Subjects
Discovery layer
Source updated
14 January 2025
Summary
Directs the Secretary of the Army, acting through the Chief of Engineers, to plan, design, engineer, and construct: (1) a flood control project on the Sheyenne River, North Dakota; and (2) a dam and reservoir on the Maple River, North Dakota. Declares that the plan to modify the Baldhill Dam for dam safety considerations shall not preclude implementation of those components of the Sheyenne River project not dependent on such safety modifications.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in Senate
summary · EN · 15 May 1985
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/99th-congress/senate-bill/1139
- Open data entity: https://api.congress.gov/v3/bill/99/s/1139