United States · Bill · S
S. 1875 (99th)
A bill to designate the Closed Basin Conveyance Channel of the Closed Basin Division, San Luis Valley Project, Colorado as the "Franklin Eddy Canal".
Introduced
21 November 1985
Last action
—
Status
Committee on Energy and Natural Resources. Ordered favorably reported H.R. 3443 in lieu of this measure.
Sponsors
—
Subjects
Discovery layer
Source updated
24 March 2026
Summary
Designates the Closed Basin Conveyance Channel of the San Luis Valley Project, Colorado, as the Franklin Eddy Canal.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in Senate
summary · EN · 21 November 1985
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/99th-congress/senate-bill/1875
- Open data entity: https://api.congress.gov/v3/bill/99/s/1875