PoliticalRepoPoliticalRepo

United States · Bill · S

S. 3506 (94th)

A bill to authorize the construction of a lock and dam project on the Mississippi River near Alton, Ill., to revoke authority for 12-foot channel studies on the upper Mississippi River and its tributaries.

referredUnited States· United States Congress· EN

Introduced

28 May 1976

Last action

Status

Referred to Senate Committee on Public Works.

Sponsors

Subjects

Discovery layer

Source updated

14 January 2025

Summary

Authorizes the Secretary of the Army, acting through the Chief of Engineers, to construct a replacement lock and dam project on the Mississippi River near Alton, Illinois. Authorizes the Secretary to undertake steps to provide for wildlife protection and recreational activities in conjunction with such project. Withdraws all authority for the Secretary of the Army to construct or study the feasibility of construction or modification of channels in the Mississippi River north of its juncture with the Illinois River. Directs the Upper Mississippi River Basin Commission to prepare a master plan by 1981 for the management of the Upper Mississippi River. Requires public hearings on a preliminary plan prior to preparation of a final plan. Establishes criteria to be considered in preparing such master plan. Authorizes the appropriation of $20,000,000 to the Commission for such study.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

No timeline events have been ingested for this record yet.

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Sponsors

No sponsors or actors listed by the source.

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.