United States · Bill · S
S. 475 (96th)
A bill to authorize the Secretary of the Interior to construct hydro-electric powerplants at various existing water projects, and for other purposes.
Introduced
22 February 1979
Last action
—
Status
Referred to Senate Committee on Energy and Natural Resources.
Sponsors
—
Subjects
Discovery layer
Source updated
24 March 2026
Summary
Authorizes the Secretary of the Interior to construct hydroelectric powerplants at the Buffalo Bill Dam powerplant, Wyoming, and the Hoover Dam powerplant, Arizona and Nevada. Stipulates that the power generated by such facilities shall be delivered to the Secretary of Energy for distribution and marketing through existing Federal hydroelectric power marketing systems.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in Senate
summary · EN · 22 February 1979
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/96th-congress/senate-bill/475
- Open data entity: https://api.congress.gov/v3/bill/96/s/475