United States · Bill · S
S. 622 (98th)
A bill to authorize the Secretary of the Interior to undertake feasibility investigations.
Introduced
1 March 1983
Last action
—
Status
Placed on Senate Legislative Calendar under General Orders. Calendar No. 468.
Sponsors
—
Subjects
Discovery layer
Source updated
24 March 2026
Summary
Authorizes the Secretary of the Interior to engage in water resource development feasibility studies of the following: (1) Chief Joseph Dam project, Washington; (2) Gibson Dam powerplant, Montana; (3) Imperial Irrigation District canal lining, California; (4) New Melones conveyance system study, California; (5) Pilot Butte powerplant, Riverton unit, Wyoming; (6) Prairie Bend unit, Nebraska (including a report of the effects on wildlife habitat); (7) Siletz River Basin project, Oregon; (8) Spring Canyon pumped-storage project, Arizona; (9) Tongue River Dam, Montana; (10) water conservation and efficient use program, All-American canal relocation project, California; (11) Upper Klamath offstream storage study, Klamath project, Oregon; (12) Blue Holes Reservoir, Wyoming; and (13) Muddy Creek hydrologic, surge relief, and erosion control study, Great Falls, Montana.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
2 official files
Reported to Senate with amendment(s)
summary · EN · 7 October 1983
Introduced in Senate
summary · EN · 1 March 1983
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/98th-congress/senate-bill/622
- Open data entity: https://api.congress.gov/v3/bill/98/s/622