United States · Bill · S
S. 712 (95th)
A bill to authorize the construction of a replacement lock and dam for Locks and Dam 26, Mississippi River near Alton, Illinois and Missouri.
Introduced
10 February 1977
Last action
—
Status
Referred to Senate Committee on Environment and Public Works.
Sponsors
—
Subjects
Discovery layer
Source updated
14 January 2025
Summary
Authorizes the Secretary of the Army, acting through the Chief of Engineers, to construct a replacement lock and dam project on the Mississippi River near Alton, Illinois. Authorizes the Secretary to undertake steps to provide for wildlife protection and recreational activities in conjunction with such project. Withdraws all authority for the Secretary of the Army to construct or study the feasibility of construction or modification of channels in the Mississippi River north of its juncture with the Illinois River. Creates an Upper Mississippi River System Council. Directs the Council to prepare a master plan by 1981 for the management of the Upper Mississippi River. Requires public hearings on a preliminary plan prior to preparation of a final plan. Establishes criteria to be considered in preparing such master plan. Authorizes the appropriation of $20,000,000 for such study.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in Senate
summary · EN · 10 February 1977
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/95th-congress/senate-bill/712
- Open data entity: https://api.congress.gov/v3/bill/95/s/712