United States · Bill · S
S. 725 (93rd)
A bill authorizing the Secretary of the Army to construct three floodwater channels for flood prevention and other purposes in the Lower Rio Grande Basin, Willacy, Hidalgo, and Cameron Counties, Texas.
Introduced
1 February 1973
Last action
—
Status
Referred to Senate Committee on Public Works.
Sponsors
—
Subjects
Discovery layer
Source updated
14 January 2025
Summary
Authorizes the Secretary of the ARmy to con- struct three floodwater channels for flood prevention and other purposes in the Lower Rio Grande Basin, Willacy, Hidalgo, and Cameron Counties, Texas. Requires the Secretary of the Army, in cooperation with the Secretary of Agriculture, to seek reasonable assurances that an adequate land treatment program satisfactory to the Secretary of Agriculture will be installed to provide necessary protection to the watershed lands and planned structural measures. Authorizes to be appropriated $21,000,000 to carry out the purposes of this Act.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in Senate
summary · EN · 1 February 1973
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/93rd-congress/senate-bill/725
- Open data entity: https://api.congress.gov/v3/bill/93/s/725