United States · Bill · S
S. 753 (109th)
Corps of Engineers Modernization and Improvement Act of 2005
Introduced
11 April 2005
Last action
—
Status
Sponsor introductory remarks on measure. (CR S7813-7814)
Sponsors
—
Subjects
Discovery layer
Source updated
15 August 2025
Summary
Corps of Engineers Modernization and Improvement Act of 2005 - Amends the Flood Control Act of 1970 to require: (1) the Secretary of the Army to revise the planning guidelines, regulations, and circulars of the Corps of Engineers to comply with specified requirements, including encouraging ecosystem restoration through the restoration of hydrologic and geomorphic processes; and (2) the Corps to develop and at least every four years update an integrated national plan to manage, rehabilitate, and modernize inland waterway and port infrastructure to meet national economic and environmental needs. Directs the Secretary to ensure that each feasibility report, general reevaluation report, and environmental impact statement of a water resource project is subject to review by an independent panel of experts if: (1) the project has an estimated total cost of more than $25 million; (2) the Governor of an affected State requests such review; (3) the head of a Federal agency charged with reviewing the project determines that it is likely to have a significant adverse impact; or (4) the Secretary determines that the project is controversial. Directs the Inspector General of the Army to appoint a Director of Independent Review to establish panels of experts to review water resources projects. Sets forth review guidelines and requirements. Permits the Secretary to recommend a project for congressional authorization only if it has projected national benefits that are at least 1.5 times as great as the estimated total project costs. Requires the Secretary to identify for deauthorization those projects whose projected remaining benefits do not meet that threshold. Sets forth revised provisions governing cost sharing for operation and maintenance of inland waterways. Establishes requirements for: (1) full mitigation of losses of aquatic and terrestrial resources, fish, and wildlife for approval of water resources projects; and (2) a record-keeping system to track mitigation for each each project constructed, operated, or maintained by the Secretary. Requires the Chief of Engineers, annually, to submit a fiscal transparency report on Corps expenditures and projects expected to be completed. Provides for deauthorization of projects for which federal funds have not been obligated over specified periods.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Introduced in Senate (text)
Introduced in Senate (text)
Introduced in Senate · EN · 11 April 2005
Introduced in Senate (PDF)
Introduced in Senate · EN · 11 April 2005
Introduced in Senate
summary · EN · 11 April 2005
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/109th-congress/senate-bill/753
- Open data entity: https://api.congress.gov/v3/bill/109/s/753