United States · Resolution · HRES
H.Res. 581 (106th)
Providing for consideration of the bill (H.R. 3986) to provide for a study of the engineering feasibility of a water exchange in lieu of electrification of the Chandler Pumping Plant at Prosser Diversion Dam, Washington.
Introduced
19 September 2000
Last action
—
Status
Motion to reconsider laid on the table Agreed to without objection.
Sponsors
—
Subjects
Discovery layer
Source updated
7 April 2025
Summary
Sets forth the rule (closed) for the consideration of H.R. 3986 (engineering feasibility study of water exchange at Prosser Diversion Dam, Washington).
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
5 official files
Engrossed in House (text)
Engrossed in House (text)
Engrossed in House · EN · 20 September 2000
Engrossed in House (PDF)
Engrossed in House · EN · 20 September 2000
Reported in House (text)
Reported in House · EN · 19 September 2000
Reported in House (PDF)
Reported in House · EN · 19 September 2000
Introduced in House
summary · EN · 19 September 2000
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/106th-congress/house-resolution/581
- Open data entity: https://api.congress.gov/v3/bill/106/hres/581