United States · Resolution · SRES
S.Res. 555 (95th)
A resolution disapproving the modification of certain shipbuilding contracts between the Department of the Navy and General Dynamics Corporation.
Introduced
8 September 1978
Last action
8 September 1978 · Introduced
Status
Referred to Senate Committee on Armed Services.
Sponsors
Sen. Proxmire, William [D-WI]
Subjects
Defence
Source updated
14 January 2025
Summary
Disapproves the obligation of the United States proposed to be made by the Secretary of the Navy in modifications to contracts numbered N00024-71-C-0268 and N00024-78-C-0206 between the United States and the Electric Boat Division of General Dynamics Corporation.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
8 September 1978
Introduced
Referred to Senate Committee on Armed Services.
Source: IntroReferral
8 September 1978
Introduced
Introduced in Senate
Source: IntroReferral
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in Senate
summary · EN · 8 September 1978
Sponsors
- Sen. Proxmire, William [D-WI] · D · Sponsor
- · ssas00 · Standing
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/95th-congress/senate-resolution/555
- Open data entity: https://api.congress.gov/v3/bill/95/sres/555
- us · 95-sres-555 · source updated 14 January 2025