Skip to content
PoliticalRepoPoliticalRepo

European Union · Record · CJ

CELEX 62024CJ0820

Judgment of the Court (Fifth Chamber) of 4 June 2026.#Strominator Elektro GmbH v Bundesimmobiliengesellschaft mbH.#Request for a preliminary ruling from the Bundesverwaltungsgericht.#Reference for a preliminary ruling – Award of public works, public supply and public service contracts – Principles of equal treatment and transparency – Directive 2014/24/EU – Article 72 – Modification of contracts during their term – Concept of ‘contracts during their term’ – Receipt of the works carried out – Submission of the final invoice – No payment made by the contracting authority.#Case C-820/24.

decidedEuropean Union· Court of Justice of the European Union· EN

Introduced

4 June 2026

Last action

4 June 2026 · Decided

Status

decided

Sponsors

—

Subjects

Discovery layer

Source updated

4 June 2026

Records

Official record CELEX 62024CJ0820 from European Union at Court of Justice of the European Union. Dated 4 June 2026. Status: decided.

Timeline

  1. 4 June 2026

    Decided

    Source: work_date_document

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

24 official files

A Bíróság ítélete (ötödik tanács), 2026. június 4.#Strominator Elektro GmbH kontra Bundesimmobiliengesellschaft mbH.#Előzetes döntéshozatal – Építési beruházásra, árubeszerzésre és szolgáltatásnyújtásra irányuló közbeszerzési szerződések – Az egyenlő bánásmód és az átláthatóság elve – 2014/24/EU irányelv – 72. cikk – A szerződések módosítása azok időtartama alatt – Az »azok időtartama alatt« fogalma – Az elvégzett munkák átvétele – A végleges számla bemutatása – Az ajánlatkérő szerv nemfizetése.#C-820/24. sz. ügy.

View fileDownload file

Reading translation

Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • A Bíróság ítélete (ötödik tanács), 2026. június 4.#Strominator Elektro GmbH kontra Bundesimmobiliengesellschaft mbH.#Előzetes döntéshozatal – Építési beruházásra, árubeszerzésre és szolgáltatásnyújtásra irányuló közbeszerzési szerződések – Az egyenlő bánásmód és az átláthatóság elve – 2014/24/EU irányelv – 72. cikk – A szerződések módosítása azok időtartama alatt – Az »azok időtartama alatt« fogalma – Az elvégzett munkák átvétele – A végleges számla bemutatása – Az ajánlatkérő szerv nemfizetése.#C-820/24. sz. ügy.

    judgment · HU · 4 June 2026

    ViewDownloadOpen at official source

  • Απόφαση του Δικαστηρίου (πέμπτο τμήμα) της 4ης Ιουνίου 2026.#Strominator Elektro GmbH κατά Bundesimmobiliengesellschaft mbH.#Αίτηση του Bundesverwaltungsgericht για την έκδοση προδικαστικής αποφάσεως.#Προδικαστική παραπομπή – Σύναψη δημοσίων συμβάσεων έργων, προμηθειών και υπηρεσιών – Αρχές της ίσης μεταχείρισης και της διαφάνειας – Οδηγία 2014/24/ΕE – Άρθρο 72 – Τροποποίηση συμβάσεων κατά τη διάρκειά τους – Έννοια του όρου “κατά τη διάρκεια” των συμβάσεων – Παραλαβή των εκτελεσθέντων έργων – Υποβολή του τελικού τιμολογίου – Μη εξόφλησή του από την αναθέτουσα αρχή.#Υπόθεση C-820/24.

    judgment · EL · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Sentencia del Tribunal de Justicia (Sala Quinta) de 4 de junio de 2026.#Strominator Elektro GmbH contra Bundesimmobiliengesellschaft mbH.#Petición de decisión prejudicial planteada por Bundesverwaltungsgericht.#Procedimiento prejudicial — Adjudicación de contratos públicos de obras, de suministro y de servicios — Principios de igualdad de trato y de transparencia — Directiva 2014/24/UE — Artículo 72 — Modificación de los contratos durante su vigencia — Concepto de contrato en “período de vigencia” — Recepción de las obras ejecutadas — Presentación de la factura final — Falta de pago por parte del poder adjudicador.#Asunto C-820/24.

    judgment · ES · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Breithiúnas na Cúirte (An Cúigiú Dlísheomra) 2026 Meitheamh 4.#Strominator Elektro GmbH v Bundesimmobiliengesellschaft mbH.#Tarchur chun réamhrialú – Conarthaí oibreacha poiblí, conarthaí soláthair phoiblí agus conarthaí seirbhíse poiblí a dhámhachtain – Prionsabail na córa comhionainne agus na trédhearcachta – Treoir 2014/24/UE – Airteagal 72 – Modhnú conarthaí le linn a dtéarma – An coincheap ‘conarthaí le linn a dtéarma’ – Glacadh le hoibreacha a rinneadh – Tíolacadh an tsonraisc deiridh – Mainneachtain íocaíochta an údaráis chonarthaigh.#Cás C-820/24.

    judgment · GA · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Rozsudok Súdneho dvora (piata komora) zo 4. júna 2026.#Strominator Elektro GmbH v. Bundesimmobiliengesellschaft mbH.#Návrh na začatie prejudiciálneho konania – Zadávanie verejných zákaziek na práce, verejných zákaziek na dodávku tovaru a verejných zákaziek na služby – Zásady rovnosti zaobchádzania a transparentnosti – Smernica 2014/24/EÚ – Článok 72 – Úprava zmlúv počas ich trvania – Pojem ,zmluvy počas ich trvania‘ – Prevzatie vykonaných prác – Predloženie konečnej faktúry – Nezaplatenie zo strany verejného obstarávateľa.#Vec C-820/24.

    judgment · SK · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Acórdão do Tribunal de Justiça (Quinta Secção) de 4 de junho de 2026.#Strominator Elektro GmbH contra Bundesimmobiliengesellschaft mbH.#Reenvio prejudicial — Adjudicação de contratos públicos de obras, fornecimento e de serviços — Princípios da igualdade de tratamento e da transparência — Diretiva 2014/24/UE — Artigo 72.o — Modificação de contratos durante o seu período de vigência — Conceito de “contratos durante o seu período de vigência” — Receção de obras executadas — Emissão da fatura final — Falta de pagamento por parte da entidade adjudicante.#Processo C-820/24.

    judgment · PT · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • 2026 m. birželio 4 d. Teisingumo Teismo (penktoji kolegija) sprendimas.#Strominator Elektro GmbH prieš Bundesimmobiliengesellschaft mbH.#Bundesverwaltungsgericht prašymas priimti prejudicinį sprendimą.#Prašymas priimti prejudicinį sprendimą – Darbų, prekių ir paslaugų viešieji pirkimai – Vienodo požiūrio ir skaidrumo principai – Direktyva 2014/24/ES – 72 straipsnis – Sutarčių keitimas jų galiojimo laikotarpiu – Sutarčių galiojimo laikotarpio sąvoka – Atliktų darbų priėmimas – Galutinės sąskaitos faktūros pateikimas – Perkančiosios organizacijos neatliktas mokėjimas.#Byla C-820/24.

    judgment · LT · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Domstolens dom (femte avdelningen) av den 4 juni 2026.#Strominator Elektro GmbH mot Bundesimmobiliengesellschaft mbH.#Begäran om förhandsavgörande – Offentlig upphandling av byggentreprenader, varor och tjänster – Likabehandlingsprincipen och öppenhetsprincipen – Direktiv 2014/24/EU – Artikel 72 – Ändring av kontrakt under löptiden – Begreppet ’löptiden’ för kontrakt – Godkännande av fullgjorda arbeten – Utfärdande av den slutliga fakturan – Utebliven betalning från den upphandlande myndigheten.#Mål C-820/24.

    judgment · SV · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Rozsudek Soudního dvora (pátého senátu) ze dne 4. června 2026.#Strominator Elektro GmbH v. Bundesimmobiliengesellschaft mbH.#Řízení o předběžné otázce – Zadávání veřejných zakázek na stavební práce, dodávky a služby – Zásady rovného zacházení a transparentnosti – Směrnice 2014/24/EU – Článek 72 – Změny smluv na veřejné zakázky v době jejich trvání – Pojem ‚smlouvy na veřejné zakázky v době jejich trvání‘ – Převzetí provedených prací – Vystavení konečné faktury – Nezaplacení ze strany veřejného zadavatele.#Věc C-820/24.

    judgment · CS · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Hotărârea Curții (Camera a cincea) din 4 iunie 2026.#Strominator Elektro GmbH împotriva Bundesimmobiliengesellschaft mbH.#Trimitere preliminară – Achiziții publice de lucrări, de bunuri și de servicii – Principiile egalității de tratament și transparenței – Directiva 2014/24/UE – Articolul 72 – Modificarea contractului în cursul perioadei sale de valabilitate – Noțiunea de «contract în cursul perioadei sale de valabilitate» – Recepția lucrărilor executate – Prezentarea facturii finale – Neplata de către autoritatea contractantă.#Cauza C-820/24.

    judgment · RO · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Wyrok Trybunału (piąta izba) z dnia 4 czerwca 2026 r.#Strominator Elektro GmbH przeciwko Bundesimmobiliengesellschaft mbH.#Odesłanie prejudycjalne – Udzielanie zamówień publicznych na roboty budowlane, dostawy i usługi – Zasady równego traktowania i przejrzystości – Dyrektywa 2014/24/UE – Artykuł 72 – Modyfikacja umów w sprawie zamówienia w okresie ich obowiązywania – Pojęcie „umów w sprawie zamówienia w okresie ich obowiązywania” – Odbiór wykonanych robót budowlanych – Przedłożenie faktury końcowej – Brak zapłaty przez instytucję zamawiającą.#Sprawa C-820/24.

    judgment · PL · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Arrest van het Hof (Vijfde kamer) van 4 juni 2026.#Strominator Elektro GmbH tegen Bundesimmobiliengesellschaft mbH.#Verzoek van Bundesverwaltungsgericht om een prejudiciële beslissing.#Prejudiciële verwijzing – Plaatsen van overheidsopdrachten voor werken, leveringen en diensten – Beginselen van gelijke behandeling en transparantie – Richtlijn 2014/24/EU – Artikel 72 – Wijziging van opdrachten gedurende de looptijd – Begrip ‚opdrachten gedurende de looptijd’ – Oplevering van de uitgevoerde werkzaamheden – Uitreiking van de eindfactuur – Geen betaling door de aanbestedende dienst.#Zaak C-820/24.

    judgment · NL · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Sentenza tal-Qorti tal-Ġustizzja (Il-Ħames Awla) tal-4 ta’ Ġunju 2026.#Strominator Elektro GmbH vs Bundesimmobiliengesellschaft mbH.#Talba għal deċiżjoni preliminari imressqa minn Bundesverwaltungsgericht.#Rinviju għal deċiżjoni preliminari — Għoti ta’ kuntratti pubbliċi għal xogħlijiet, għal provvisti u għal servizzi — Prinċipji ta’ ugwaljanza fit-trattament u ta’ trasparenza — Direttiva 2014/24/UE — Artikolu 72 — Modifika tal-kuntratti matul it-terminu tagħhom — Kunċett ta’ ‘kuntratti matul it-terminu tagħhom’ — Aċċettazzjoni tax-xogħlijiet eżegwiti — Tressiq tal-fattura finali — Assenza ta’ ħlas min-naħa tal-awtorità kontraenti.#Kawża C-820/24.

    judgment · MT · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Tiesas spriedums (piektā palāta), 2026. gada 4. jūnijs.#Strominator Elektro GmbH pret Bundesimmobiliengesellschaft mbH.#Lūgums sniegt prejudiciālu nolēmumu – Būvdarbu, piegādes un pakalpojumu publiskie iepirkumi – Vienlīdzīgas attieksmes un pārskatāmības principi – Direktīva 2014/24/ES – 72. pants – Līgumu izmaiņas to darbības laikā – Jēdziens “līgumu darbības laiks” – Veikto būvdarbu pieņemšana – Galīgā rēķina izsniegšana – Līgumslēdzēja iestādes neveikts maksājums.#Lieta C-820/24.

    judgment · LV · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Euroopa Kohtu otsus (viies koda), 4.6.2026.#Strominator Elektro GmbH versus Bundesimmobiliengesellschaft mbH.#Eelotsusetaotlus – Ehitustööde, asjade ja teenuste riigihanked – Võrdse kohtlemise ja läbipaistvuse põhimõtted – Direktiiv 2014/24/EL – Artikkel 72 – Lepingute muudatused nende kehtivusajal – Mõiste „hankelepingud nende kehtivusajal“ – Tehtud ehitustööde vastuvõtmine – Lõpparve esitamine – Hankija poolt tasu maksmata jätmine.#Kohtuasi C-820/24.

    judgment · ET · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Presuda Suda (peto vijeće) od 4. lipnja 2026.#Strominator Elektro GmbH protiv Bundesimmobiliengesellschaft mbH.#Zahtjev za prethodnu odluku – Javna nabava radova, robe i usluga – Načela jednakog postupanja i transparentnosti – Direktiva 2014/24/EU – Članak 72. – Izmjena ugovora tijekom njegova trajanja – Pojam ‚ugovori koji su u tijeku’ – Primitak izvedenih radova – Ispostavljanje konačnog računa – Neplaćanje od strane javnog naručitelja.#Predmet C-820/24.

    judgment · HR · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Unionin tuomioistuimen tuomio (viides jaosto) 4.6.2026.#Strominator Elektro GmbH vastaan Bundesimmobiliengesellschaft mbH.#Bundesverwaltungsgericht esittämä Ennakkoratkaisupyyntö.#Ennakkoratkaisupyyntö – Rakennusurakoita, tavaroita ja palveluja koskevat julkiset hankinnat – Yhdenvertaisen kohtelun periaate ja avoimuusperiaate – Direktiivi 2014/24/EU – 72 artikla – Hankintasopimusten muuttaminen niiden voimassaoloaikana – Hankintasopimusten voimassaoloajan käsite – Toteutettujen rakennusurakoiden hyväksyminen – Loppulaskun esittäminen – Hankintaviranomainen ei ole suorittanut maksua.#Asia C-820/24.

    judgment · FI · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Domstolens dom (Femte Afdeling) af 4. juni 2026.#Strominator Elektro GmbH mod Bundesimmobiliengesellschaft mbH.#Præjudiciel forelæggelse – indgåelse af offentlige vareindkøbskontrakter, offentlige tjenesteydelseskontrakter og offentlige bygge- og anlægskontrakter – principperne om ligebehandling og gennemsigtighed – direktiv 2014/24/EU – artikel 72 – ændring af kontrakter i deres løbetid – begrebet »kontrakter i deres løbetid« – modtagelse af udført arbejde – udstedelse af den endelige faktura – den ordregivende myndigheds manglende betaling.#Sag C-820/24.

    judgment · DA · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Sodba Sodišča (peti senat) z dne 4. junija 2026.#Strominator Elektro GmbH proti Bundesimmobiliengesellschaft mbH.#Predhodno odločanje – Javno naročanje gradenj, blaga in storitev – Načeli enakega obravnavanja in preglednosti – Direktiva 2014/24/EU – Člen 72 – Spremembe pogodb o izvedbi javnih naročil med njihovo veljavnostjo – Pojem ,pogodba o izvedbi javnega naročila med [njeno] veljavnostjo‘ – Prevzem izvedenih del – Predložitev končnega računa – Neplačilo s strani javnega naročnika.#Zadeva C-820/24.

    judgment · SL · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Sentenza della Corte (Quinta Sezione) del 4 giugno 2026.#Strominator Elektro GmbH contro Bundesimmobiliengesellschaft mbH.#Rinvio pregiudiziale – Aggiudicazione di appalti pubblici di lavori, di forniture e di servizi – Principi di parità di trattamento e di trasparenza – Direttiva 2014/24/UE – Articolo 72 – Modifica di contratti durante il periodo di validità – Nozione di “contratti durante il periodo di validità” – Accettazione dei lavori eseguiti – Presentazione della fattura finale – Mancato pagamento da parte dell’amministrazione aggiudicatrice.#Causa C-820/24.

    judgment · IT · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Решение на Съда (пети състав) от 4 юни 2026 г.#Strominator Elektro GmbH срещу Bundesimmobiliengesellschaft mbH.#Преюдициално запитване — Възлагане на обществени поръчки за строителство, доставки и услуги — Принципи на равно третиране и прозрачност — Директива 2014/24/EО — Член 72 — Изменение на договорите за поръчка през техния срок на изпълнение — Понятие „договори за поръчка през техния срок на изпълнение“ — Приемане на извършеното строителство — Представяне на окончателната фактура — Липса на плащане от страна на възлагащия орган.#Дело C-820/24.

    judgment · BG · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Urteil des Gerichtshofs (Fünfte Kammer) vom 4. Juni 2026.#Strominator Elektro GmbH gegen Bundesimmobiliengesellschaft mbH.#Vorabentscheidungsersuchen der Bundesverwaltungsgericht.#Vorlage zur Vorabentscheidung – Vergabe öffentlicher Bauaufträge, Lieferaufträge und Dienstleistungsaufträge – Grundsätze der Gleichbehandlung und der Transparenz – Richtlinie 2014/24/EU – Art. 72 – Auftragsänderungen während der Vertragslaufzeit – Wendung ,während der Laufzeit eines Auftrags‘ – Abnahme der erbrachten Bauleistungen – Legung der Schlussrechnung – Fehlende Zahlung des öffentlichen Auftraggebers.#Rechtssache C-820/24.

    judgment · DE · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Arrêt de la Cour (cinquième chambre) du 4 juin 2026.#Strominator Elektro GmbH contre Bundesimmobiliengesellschaft mbH.#Demande de décision préjudicielle, introduite par le Bundesverwaltungsgericht.#Renvoi préjudiciel – Passation de marchés publics de travaux, de fournitures et de services – Principes d’égalité de traitement et de transparence – Directive 2014/24/UE – Article 72 – Modification de marchés en cours – Notion de “marchés en cours” – Réception des travaux exécutés – Présentation de la facture finale – Absence de paiement de la part du pouvoir adjudicateur.#Affaire C-820/24.

    judgment · FR · 4 June 2026

    ViewDownloadOpen at official source

    Reading translation

    Translate this document into your language. PoliticalRepo does not store a separate copy per EU language.

    On-demand whole-document translation with a downloadable PDF (logo + link to the official source). The official file stays authoritative.

  • Judgment of the Court (Fifth Chamber) of 4 June 2026.#Strominator Elektro GmbH v Bundesimmobiliengesellschaft mbH.#Request for a preliminary ruling from the Bundesverwaltungsgericht.#Reference for a preliminary ruling – Award of public works, public supply and public service contracts – Principles of equal treatment and transparency – Directive 2014/24/EU – Article 72 – Modification of contracts during their term – Concept of ‘contracts during their term’ – Receipt of the works carried out – Submission of the final invoice – No payment made by the contracting authority.#Case C-820/24.

    judgment · EN · 4 June 2026

    ViewDownloadOpen at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

  • · CJ · Court of Justice of the European Union

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.