European Union · Report · CC
CELEX 62018CC0031
Opinion of Advocate General Pitruzzella delivered on 16 May 2019.#„Elektrorazpredelenie Yug“ EAD v Komisia za energiyno i vodno regulirane (KEVR).#Request for a preliminary ruling from the Administrativen sad Sofia-grad.#Reference for a preliminary ruling — Directive 2009/72/EC — Internal market in electricity — Article 2(3) to (6) — Concepts of electricity transmission system and electricity distribution system — Distinguishing criteria — Voltage — Ownership of installations — Article 17(1)(a) — Independent transmission operator — Articles 24 and 26 — Distribution system operator — Article 32(1) — Free third-party access — Access to medium-voltage electricity — Interconnection points between transmission and distribution systems — Discretion of the Member States.#Case C-31/18.
Introduced
16 May 2019
Last action
16 May 2019 · Decided
Status
decided
Sponsors
—
Subjects
Energy
Source updated
16 May 2019
Record
Official report CELEX 62018CC0031 from European Union at Court of Justice of the European Union. Dated 16 May 2019. Status: decided.
Timeline
16 May 2019
Decided
Source: work_date_document
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
23 official files
Opinion of Advocate General Pitruzzella delivered on 16 May 2019.#„Elektrorazpredelenie Yug“ EAD v Komisia za energiyno i vodno regulirane (KEVR).#Request for a preliminary ruling from the Administrativen sad Sofia-grad.#Reference for a preliminary ruling — Directive 2009/72/EC — Internal market in electricity — Article 2(3) to (6) — Concepts of electricity transmission system and electricity distribution system — Distinguishing criteria — Voltage — Ownership of installations — Article 17(1)(a) — Independent transmission operator — Articles 24 and 26 — Distribution system operator — Article 32(1) — Free third-party access — Access to medium-voltage electricity — Interconnection points between transmission and distribution systems — Discretion of the Member States.#Case C-31/18.
judgment · EN · 16 May 2019
Conclusie van advocaat-generaal G. Pitruzzella van 16 mei 2019.#„Elektrorazpredelenie Yug” EAD tegen Komisia za energiyno i vodno regulirane (KEVR).#Verzoek van de Administrativen sad Sofia-grad om een prejudiciële beslissing.#Prejudiciële verwijzing – Richtlijn 2009/72/EG – Interne markt voor elektriciteit – Artikel 2, punten 3 tot en met 6 – Begrippen ,elektriciteitstransmissiesysteem’ en ,elektriciteitsdistributiesysteem’ – Onderscheidingscriteria – Spanningsniveau – Eigendom van de installaties – Artikel 17, lid 1, onder a) – Onafhankelijke transmissiesysteembeheerder – Artikelen 24 en 26 – Distributiesysteembeheerder – Artikel 32, lid 1 – Vrije toegang van derden – Toegang tot middenspanningselektriciteit – Interconnectiepunten tussen de transmissie‑ en distributiesystemen – Beleidsruimte van de lidstaten.#Zaak C-31/18.
judgment · NL · 16 May 2019
Konklużjonijiet tal-Avukat Ġenerali G. Pitruzzella, ippreżentati fis-16 ta’ Mejju 2019.#„Elektrorazpredelenie Yug“ EAD vs Komisia za energiyno i vodno regulirane (KEVR).#Talba għal deċiżjoni preliminari, imressqa mill-Administrativen sad Sofia-grad.#Rinviju għal deċiżjoni preliminari – Direttiva 2009/72/KE – Suq intern tal-elettriku – Il-punti 3 sa 6 tal-Artikolu 2 – Kunċetti ta’ netwerk ta’ trażmissjoni tal-elettriku u ta’ netwerk ta’ distribuzzjoni tal-elettriku – Kriterji ta’ distinzjoni – Livell ta’ vultaġġ – Proprjetà tal-installazzjonijiet – Artikolu 17(1)(a) – Operatur ta’ netwerk ta’ trażmissjoni indipendenti – Artikoli 24 u 26 – Operatur ta’ netwerk ta’ distribuzzjoni – Artikolu 32(1) – Aċċess liberu tat-terzi – Aċċess għall-elettriku ta’ vultaġġ medju – Punti ta’ interkonnessjoni bejn in-netwerks ta’ trażmissjoni u ta’ distribuzzjoni – Marġni ta’ diskrezzjoni tal-Istati Membri.#Kawża C-31/18.
judgment · MT · 16 May 2019
Forslag til afgørelse fra generaladvokat G. Pitruzzella fremsat den 16. maj 2019.#„Elektrorazpredelenie Yug“ EAD mod Komisia za energiyno i vodno regulirane (KEVR).#Anmodning om præjudiciel afgørelse indgivet af Administrativen sad Sofia-grad.#Præjudiciel forelæggelse – direktiv 2009/72/EF – det indre marked for elektricitet – artikel 2, nr. 3)- 6) – begreberne »elektricitetstransmissionssystem« og »elektricitetsdistributionssystem« – sondringskriterier – spændingsniveau – ejendomsretten til aktiverne – artikel 17, stk. 1, litra a) – uafhængig transmissionssystemoperatør – artikel 24 og 26 – distributionssystemoperatør – artikel 32, stk. 1 – tredjeparters frie adgang – adgang til mellemspændingselektricitet – sammenkoblingspunkter mellem transmissions- og distributionssystemerne – medlemsstaternes skøn.#Sag C-31/18.
judgment · DA · 16 May 2019
Conclusiones del Abogado General Sr. G. Pitruzzella, presentadas el 16 de mayo de 2019.#„Elektrorazpredelenie Yug“ EAD contra Komisia za energiyno i vodno regulirane (KEVR).#Petición de decisión prejudicial planteada por el Administrativen sad Sofia-grad.#Procedimiento prejudicial — Directiva 2009/72/CE — Mercado interior de la electricidad — Artículo 2, puntos 3 a 6 — Conceptos de red de transporte de electricidad y red de distribución de electricidad — Criterios de distinción — Nivel de tensión — Propiedad de las instalaciones — Artículo 17, apartado 1, letra a) — Gestor de red de transporte independiente — Artículos 24 y 26 — Gestor de red de distribución — Artículo 32, apartado 1 — Libre acceso de terceros — Acceso a la electricidad de media tensión — Puntos de interconexión entre las redes de transporte y de distribución — Margen de maniobra de los Estados miembros.#Asunto C-31/18.
judgment · ES · 16 May 2019
Förslag till avgörande av generaladvokat G. Pitruzzella föredraget den 16 maj 2019.#"Elektrorazpredelenie Yug" EAD mot Komisia za energiyno i vodno regulirane (KEVR).#Begäran om förhandsavgörande från Administrativen sad Sofia-grad.#Begäran om förhandsavgörande – Direktiv 2009/72/EG – Inre marknaden för el – Artikel 2 leden 3 – 6 – Begreppet överföringssystem av el och begreppet distributionssystem för el – Särskiljningskriterier – Spänningsnivå – Ägande av anläggningarna – Artikel 17.1 a – Oberoende systemansvarig för överföringssystemet – Artiklarna 24 och 26 – Systemansvarig för distributionssystemet – Artikel 32.1 – Fritt tillträde för tredje parter – Tillträde till mellanspännningsel – Sammanlänkningspunkter mellan överföringssystemet och distributionssystemet – Medlemsstaternas handlingsutrymme.#Mål C-31/18.
judgment · SV · 16 May 2019
G. Pitruzzella főtanácsnok indítványa, az ismertetés napja: 2019. május 16.#„Elektrorazpredelenie Yug“ EAD kontra Komisia za energiyno i vodno regulirane (KEVR).#Az Administrativen sad Sofia-grad (Bulgária) által benyújtott előzetes döntéshozatal iránti kérelem.#Előzetes döntéshozatal – 2009/72/EK irányelv – A villamos energia belső piaca – A 2. cikk 3 – 6. pontja – A villamosenergia‑átviteli rendszer és a villamosenergiaelosztó‑rendszer fogalma – Elhatárolási kritériumok – Feszültségi szint – A létesítmények feletti tulajdonjog – A 17. cikk (1) bekezdésének a) pontja – Független átvitelirendszer‑üzemeltető – 24. és 26. cikk – Elosztórendszer‑üzemeltető – A 32. cikk (1) bekezdése – Harmadik felek szabad hozzáférése – Középfeszültségű villamos energiához való hozzáférés – Az átviteli rendszer és az elosztórendszer közötti összekötő pontok – A tagállamok mérlegelési mozgástere.#C-31/18. sz. ügy.
judgment · HU · 16 May 2019
Conclusões do advogado-geral G. Pitruzzella apresentadas em 16 de maio de 2019.#«Elektrorazpredelenie Yug» EAD contra Komisia za energiyno i vodno regulirane (KEVR).#Pedido de decisão prejudicial apresentado pelo Administrativen sad Sofia-grad.#Reenvio prejudicial — Diretiva 2009/72/CE — Mercado interno da eletricidade — Artigo 2.o, n.os 3 a 6 — Conceitos de rede de transporte de eletricidade e de rede de distribuição de eletricidade — Critérios de distinção — Nível de tensão — Propriedade das instalações — Artigo 17.o, n.o 1, alínea a) — Operador de rede de transporte independente — Artigos 24.o e 26.o — Operador de rede de distribuição — Artigo 32.o, n.o 1 — Livre acesso de terceiros — Acesso à eletricidade de média tensão — Pontos de interconexão entre as redes de transporte e de distribuição — Margem de manobra dos Estados‑Membros.#Processo C-31/18.
judgment · PT · 16 May 2019
Заключение на генералния адвокат G. Pitruzzella, представено на 16 май 2019 г.#„Електроразпределение Юг“ ЕАД срещу Комисия за енергийно и водно регулиране (КЕВР).#Преюдициално запитване, отправено от Административен съд София-град.#Преюдициално запитване — Директива 2009/72/ЕО — Вътрешен пазар на електроенергия — Член 2, точки 3 — 6 — Понятия за електропреносна и електроразпределителна мрежа — Критерии за разграничаване — Ниво на напрежение — Собственост върху съоръженията — Член 17, параграф 1, буква a) — Независим оператор на електропреносна мрежа — Членове 24 и 26 — Оператор на електроразпределителна мрежа — Член 32, параграф 1 — Свободен достъп на трети страни — Достъп до електроенергия със средно напрежение — Точки на свързване на преносната и разпределителната мрежа — Свобода на действие на държавите членки.#Дело C-31/18.
judgment · BG · 16 May 2019
Προτάσεις του γενικού εισαγγελέα G. Pitruzzella της 16ης Μαΐου 2019.#„Elektrorazpredelenie Yug“ EAD κατά Komisia za energiyno i vodno regulirane (KEVR).#Αίτηση του Administrativen sad Sofia-grad για την έκδοση προδικαστικής αποφάσεως.#Προδικαστική παραπομπή – Οδηγία 2009/72/ΕΚ – Εσωτερική αγορά ηλεκτρικής ενέργειας – Άρθρο 2, σημεία 3 έως 6 – Έννοιες του συστήματος μεταφοράς ηλεκτρικής ενέργειας και του συστήματος διανομής ηλεκτρικής ενέργειας – Κριτήρια διακρίσεως – Επίπεδο τάσης – Ιδιοκτησιακό καθεστώς των εγκαταστάσεων – Άρθρο 17, παράγραφος 1, στοιχείο αʹ – Ανεξάρτητος διαχειριστής συστήματος μεταφοράς – Άρθρα 24 και 26 – Διαχειριστής συστήματος διανομής – Άρθρο 32, παράγραφος 1 – Ελεύθερη πρόσβαση τρίτων – Πρόσβαση στην ηλεκτρική ενέργεια μέσης τάσης – Σημεία διασύνδεσης μεταξύ των συστημάτων μεταφοράς και διανομής – Περιθώριο χειρισμών των κρατών μελών.#Υπόθεση C-31/18.
judgment · EL · 16 May 2019
Kohtujurist Pitruzzella ettepanek, 16.5.2019.#„Elektrorazpredelenie Yug“ EAD versus Komisia za energiyno i vodno regulirane (KEVR).#Eelotsusetaotlus, mille on esitanud Administrativen sad Sofia-grad.#Eelotsusetaotlus – Direktiiv 2009/72/EÜ – Elektrienergia siseturg – Artikli 2 punktid 3 – 6 – Mõisted „elektrienergia põhivõrk“ ja „elektrienergia jaotusvõrk“ – Eristuskriteeriumid – Pingetase – Rajatiste omand – Artikli 17 lõike 1 punkt a – Sõltumatu põhivõrguettevõtja – Artiklid 24 ja 26 – Jaotusvõrguettevõtja – Artikli 32 lõige 1 – Kolmandate isikute vaba juurdepääs – Juurdepääs keskpingeelektrile – Põhivõrgu ja jaotusvõrgu vahelised ühenduspunktid – Liikmesriikide tegutsemisruum.#Kohtuasi C-31/18.
judgment · ET · 16 May 2019
Mišljenje nezavisnog odvjetnika G. Pitruzzelle od 16. svibnja 2019.#„Elektrorazpredelenie Yug“ EAD protiv Komisija za energijno i vodno regulirane (KEVR).#Zahtjev za prethodnu odluku koji je uputio Administrativen sad Sofia-grad.#Zahtjev za prethodnu odluku – Direktiva 2009/72/EZ – Unutarnje tržište električne energije – Članak 2. točke 3. do 6. – Pojam sustava za prijenos električne energije i pojam sustava za distribuciju električne energije – Kriteriji za razlikovanje – Visina napona – Vlasništvo nad instalacijama – Članak 17. stavak 1. točka (a) – Neovisni operator prijenosnog sustava – Članci 24. i 26. – Operator distribucijskog sustava – Članak 32. stavak 1. – Slobodan pristup trećih osoba – Pristup električnoj energiji pod srednjim naponom – Spojni vodovi između prijenosnih i distribucijskih sustava – Diskrecijski prostor država članica.#Predmet C-31/18.
judgment · HR · 16 May 2019
Sklepni predlogi generalnega pravobranilca G. Pitruzzelle, predstavljeni 16. maja 2019.#„Elektrorazpredelenie Yug“ EAD proti Komisia za energiyno i vodno regulirane (KEVR).#Predlog za sprejetje predhodne odločbe, ki ga je vložilo Administrativen sad Sofia-grad.#Predhodno odločanje – Direktiva 2009/72/ES – Notranji trg z električno energijo – Člen 2, točke od 3 do 6 – Pojma prenosnega sistema električne energije in distribucijskega sistema električne energije – Merila za razmejitev – Napetostni nivo – Lastništvo obratov – Člen 17(1)(a) – Neodvisni operater prenosnega sistema – Člena 24 in 26 – Operater distribucijskega sistema – Člen 32(1) – Prost dostop tretjih oseb – Dostop do električne energije srednje napetosti – Povezovalne točke med prenosnimi in distribucijskimi sistemi – Manevrski prostor držav članic.#Zadeva C-31/18.
judgment · SL · 16 May 2019
Concluziile avocatului general G. Pitruzzella prezentate la 16 mai 2019.#„Elektrorazpredelenie Yug” EAD împotriva Komisia za energiyno i vodno regulirane (KEVR).#Cerere de decizie preliminară formulată de Administrativen sad Sofia-grad.#Trimitere preliminară – Directiva 2009/72/CE – Piața internă a energiei electrice – Articolul 2 punctele 3-6 – Noțiunile de rețea de transport de energie electrică și de rețea de distribuție de energie electrică – Criterii de distincție – Nivelul de tensiune – Dreptul de proprietate asupra instalațiilor – Articolul 17 alineatul (1) litera (a) – Operator de transport și de sistem independent – Articolele 24 și 26 – Operator de distribuție – Articolul 32 alineatul (1) – Acces liber al terților – Acces la energia electrică de medie tensiune – Puncte de interconexiune între rețelele de transport și de distribuție – Marja de manevră a statelor membre.#Cauza C-31/18.
judgment · RO · 16 May 2019
Schlussanträge des Generalanwalts G. Pitruzzella vom 16. Mai 2019.#„Elektrorazpredelenie Yug“ EAD gegen Komisia za energiyno i vodno regulirane (KEVR).#Vorabentscheidungsersuchen des Administrativen sad Sofia-grad.#Vorlage zur Vorabentscheidung – Richtlinie 2009/72/EG – Elektrizitätsbinnenmarkt – Art. 2 Nrn. 3 bis 6 – Begriffe Elektrizitätsübertragungs- und Elektrizitätsverteilernetz – Unterscheidungskriterien – Spannungsebene – Eigentum an den Anlagen – Art. 17 Abs. 1 Buchst. a – Unabhängiger Übertragungsnetzbetreiber – Art. 24 und 26 – Verteilernetzbetreiber – Art. 32 Abs. 1 – Freier Zugang Dritter – Zugang zu Mittelspannungsstrom – Verbindungspunkte zwischen dem Übertragungs- und dem Verteilernetz – Spielraum der Mitgliedstaaten.#Rechtssache C-31/18.
judgment · DE · 16 May 2019
Návrhy prednesené 16. mája 2019 – generálny advokát G. Pitruzzella.#„Elektrorazpredelenie Jug“ EAD proti Komisija za energijno i vodno regulirane (KEVR).#Návrh na začatie prejudiciálneho konania, ktorý podal Administrativen săd Sofija-grad.#Návrh na začatie prejudiciálneho konania – Smernica 2009/72/ES – Vnútorný trh s elektrickou energiou – Článok 2 body 3 až 6 – Pojmy elektrická prenosová sústava a elektrická distribučná sústava – Rozlišovacie kritériá – Úroveň napätia – Vlastníctvo zariadení – Článok 17 ods. 1 písm. a) – Nezávislý prevádzkovateľ prenosovej sústavy – Články 24 a 26 – Prevádzkovateľ distribučnej sústavy – Článok 32 ods. 1 – Voľný prístup tretích strán – Prístup k elektrine stredného napätia – Body prepojenia medzi prenosovou sústavou a distribučnou sústavou – Voľná úvaha členských štátov.#Vec C-31/18.
judgment · SK · 16 May 2019
Ģenerāladvokāta Dž. Pitrucellas [G. Pitruzzella] secinājumi, 2019. gada 16. maijs.#“Elektrorazpredelenie Yug” EAD pret Komisia za energiyno i vodno regulirane (KEVR).#Administrativen sad Sofia-grad lūgums sniegt prejudiciālu nolēmumu.#Lūgums sniegt prejudiciālu nolēmumu – Direktīva 2009/72/EK – Elektroenerģijas iekšējais tirgus – 2. panta 3. – 6. punkts – Jēdzieni “elektroenerģijas pārvades sistēma” un “elektroenerģijas sadales sistēma” – Nošķiršanas kritēriji – Sprieguma līmenis – Īpašumtiesības uz iekārtām – 17. panta 1. punkta a) apakšpunkts – Neatkarīgs pārvades sistēmas operators – 24. un 26. pants – Sadales sistēmas operators – 32. panta 1. punkts – Trešo personu brīva piekļuve – Piekļuve vidēja sprieguma elektroenerģijai – Pārvades un sadales sistēmu starpsavienojuma punkti – Dalībvalstu rīcības brīvība.#Lieta C-31/18.
judgment · LV · 16 May 2019
Julkisasiamies G. Pitruzzellan ratkaisuehdotus 16.5.2019.#”Elektrorazpredelenie Yug” EAD vastaan Komisia za energiyno i vodno regulirane (KEVR).#Administrativen sad Sofia-gradin esittämä ennakkoratkaisupyyntö.#Ennakkoratkaisupyyntö – Direktiivi 2009/72/EY – Sähkön sisämarkkinat – 2 artiklan 3 – 6 alakohta – Sähkönsiirtoverkon ja sähkönjakeluverkon käsitteet – Erotteluperusteet – Jännitetaso – Laitosten omistusoikeus – 17 artiklan 1 kohdan a alakohta – Riippumaton siirtoverkonhaltija – 24 ja 26 artikla – Jakeluverkonhaltija – 32 artiklan 1 kohta – Kolmannen osapuolen vapaa pääsy – Pääsy keskijänniteverkkoon – Siirto- ja jakeluverkkojen väliset yhteenliittämispisteet – Jäsenvaltioiden harkintavallan rajat.#Asia C-31/18.
judgment · FI · 16 May 2019
Generalinio advokato G. Pitruzzella išvada, pateikta 2019 m. gegužės 16 d.#„Elektrorazpredelenie Yug“ EAD prieš Komisia za energiyno i vodno regulirane (KEVR).#Administrativen sad Sofia-grad prašymas priimti prejudicinį sprendimą.#Prašymas priimti prejudicinį sprendimą – Direktyva 2009/72/EB – Elektros energijos vidaus rinka – 2 straipsnio 3 – 6 punktai – Elektros energijos perdavimo sistemos ir elektros energijos skirstymo sistemos sąvokos – Atskyrimo kriterijai – Įtampos lygmuo – Įrenginių nuosavybė – 17 straipsnio 1 dalies a punktas – Nepriklausomos perdavimo sistemos operatorius – 24 ir 26 straipsniai – Skirstymo sistemos operatorius – 32 straipsnio 1 dalis – Laisva trečiųjų asmenų prieiga – Prieiga prie vidutinės įtampos elektros energijos – Perdavimo ir skirstymo sistemų sujungimo taškai – Valstybių narių diskrecija.#Byla C-31/18.
judgment · LT · 16 May 2019
Opinia rzecznika generalnego G. Pitruzzelli przedstawiona w dniu 16 maja 2019 r.#„Elektrorazpredelenie Yug” EAD przeciwko Komisia za energiyno i vodno regulirane (KEVR).#Wniosek o wydanie orzeczenia w trybie prejudycjalnym złożony przez Administrativen sad Sofia-grad.#Odesłanie prejudycjalne – Dyrektywa 2009/72/WE – Rynek wewnętrzny energii elektrycznej – Artykuł 2 pkt 3–6 – Pojęcia systemu przesyłu energii elektrycznej i systemu dystrybucji energii elektrycznej – Kryteria rozróżnienia – Poziom napięcia – Własność instalacji – Artykuł 17 ust. 1 lit. a) – Niezależny operator systemu przesyłowego – Artykuły 24 i 26 – Operator systemu dystrybucyjnego – Artykuł 32 ust. 1 – Swobodny dostęp dla osób trzecich – Dostęp do energii elektrycznej średniego napięcia – Punkty wzajemnych połączeń między systemami przesyłowym i dystrybucyjnym – Zakres swobody państw członkowskich.#Sprawa C-31/18.
judgment · PL · 16 May 2019
Conclusions de l'avocat général M. G. Pitruzzella, présentées le 16 mai 2019.#« Elektrorazpredelenie Yug » EAD contre Komisia za energiyno i vodno regulirane (KEVR).#Demande de décision préjudicielle, introduite par l'Administrativen sad Sofia-grad.#Renvoi préjudiciel – Directive 2009/72/CE – Marché intérieur de l’électricité – Article 2, points 3 à 6 – Notions de réseau de transport d’électricité et de réseau de distribution d’électricité – Critères de distinction – Niveau de tension – Propriété des installations – Article 17, paragraphe 1, sous a) – Gestionnaire de réseau de transport indépendant – Articles 24 et 26 – Gestionnaire de réseau de distribution – Article 32, paragraphe 1 – Libre accès des tiers – Accès à l’électricité à moyenne tension – Points d’interconnexion entre les réseaux de transport et de distribution – Marge de manœuvre des États membres.#Affaire C-31/18.
judgment · FR · 16 May 2019
Conclusioni dell’avvocato generale G. Pitruzzella, presentate il 16 maggio 2019.#«Elektrorazpredelenie Yug» EAD contro Komisia za energiyno i vodno regulirane (KEVR).#Domanda di pronuncia pregiudiziale proposta dall'Administrativen sad Sofia-grad.#Rinvio pregiudiziale – Direttiva 2009/72/CE – Mercato interno dell’energia elettrica – Articolo 2, punti da 3 a 6 – Nozioni di sistema di trasmissione di energia elettrica e di sistema di distribuzione di energia elettrica – Criteri distintivi – Livello di tensione – Proprietà delle installazioni – Articolo 17, paragrafo 1, lettera a) – Gestore del sistema di trasmissione indipendente – Articoli 24 e 26 – Gestore del sistema di distribuzione – Articolo 32, paragrafo 1 – Libero accesso dei terzi – Accesso all’energia elettrica a media tensione – Punti di interconnessione tra i sistemi di trasmissione e i sistemi di distribuzione – Margine di discrezionalità degli Stati membri.#Causa C-31/18.
judgment · IT · 16 May 2019
Stanovisko generálního advokáta G. Pitruzzelly přednesené dne 16. května 2019.#„Elektrorazpredelenie Yug“ EAD v. Komisia za energiyno i vodno regulirane (KEVR).#Žádost o rozhodnutí o předběžné otázce podaná Administrativen sad Sofia-grad.#Řízení o předběžné otázce – Směrnice 2009/72/ES – Vnitřní trh s elektřinou – Článek 2 body 3 až 6 – Pojmy ‚přenosová soustava elektřiny‘ a ‚distribuční soustava elektřiny‘ – Kritéria rozlišení – Napěťová hladina – Vlastnictví zařízení – Článek 17 odst. 1 písm. a) – Nezávislý provozovatel přenosové soustavy – Články 24 a 26 – Provozovatel distribuční soustavy – Článek 32 odst. 1 – Volný přístup třetích osob – Přístup k elektřině středního napětí – Propojovací body mezi přenosovou a distribuční soustavou – Volný prostor pro uvážení členských států.#Věc C-31/18.
judgment · CS · 16 May 2019
Sponsors
- · CJ · Court of Justice of the European Union
- · b87d36ea-f6fe-11e8-9982-01aa75ed71a1 · b87d36ea-f6fe-11e8-9982-01aa75ed71a1
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:62018CC0031
- Open data entity: http://publications.europa.eu/resource/cellar/a76d7865-77c6-11e9-9f05-01aa75ed71a1
- eurlex · 62018CC0031 · source updated 16 May 2019