To ask the Secretary of State for Energy and Climate Change, for each operational nuclear power plant in the UK, what the available operating capacity in mega watts is; which of those plants have life extensions in place; for how long these extensions wil
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
15 June 2015
Written question
To ask the Secretary of State for Energy and Climate Change, for each operational nuclear power plant in the UK, what the available operating capacity in mega watts is; which of those plants have life extensions in place; for how long these extensions wil
Source: Commons
22 June 2015
Answer
The decision on whether to extend the life of a nuclear power station is for the owners in conjunction with the regulators. The Regulators do not set prescribed lifetimes for UK nuclear power stations. The owners/operators of nuclear power plants make a c...
Source: Written answer
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
No documents linked.
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Sponsors
- · Department for Energy and Climate Change · Answering body
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://questions-statements.parliament.uk/written-questions/detail/2015-06-15/2444
- Open data entity: https://questions-statements-api.parliament.uk/api/writtenquestions/questions/381218
- uk · wq-381218 · source updated 22 June 2015