United States · Bill · HR
H.R. 1021 (95th)
Electric Power Production Authority Act
Introduced
4 January 1977
Last action
—
Status
Referred to House Committee on Interstate and Foreign Commerce.
Sponsors
—
Subjects
Discovery layer
Source updated
2 September 2025
Summary
Electric Power Production Authority Act - Establishes, within the Department of Commerce, an Electric Power Production Authority. Directs the Authority to: (1) assure that adequate supplies of electric energy, based on proven and developed technology, are available to meet the anticipated needs of the United States; (2) review the demand and supply of electric energy in the United States and report annually to the Congress; and (3) loan to investor-owned electric utilities or States or municipal power authorities sums up to 100 percent of the costs of new electric powerplant distribution and transmission facilities. Authorizes the appropriation of $50,000,000,000 over a ten-year period for such purposes. Authorizes the Authority to provide loans and loan guarantees for the purchase of coal and nuclear fuel supplies in order to meet anticipated requirements of electric powerplants. Authorizes the appropriation of $1,000,000,000 over a ten-year period for such purpose.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in House
summary · EN · 4 January 1977
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/95th-congress/house-bill/1021
- Open data entity: https://api.congress.gov/v3/bill/95/hr/1021