PoliticalRepoPoliticalRepo

United States · Bill · HR

H.R. 1183 (105th)

To extend the deadline under the Federal Power Act for the construction of the Swamp Creek and Ruth Creek hydroelectric projects located in the State of Washington, and for other purposes.

referredUnited States· United States Congress· EN

Introduced

20 March 1997

Last action

4 April 1997 · Referred

Status

Referred to the Subcommittee on Energy and Power.

Sponsors

Rep. Metcalf, Jack [R-WA-2]

Subjects

Energy

Source updated

15 January 2025

Energy

Summary

Authorizes the Federal Energy Regulatory Commission, upon request of the project licensee, to extend the time required to commence construction of the Ruth Creek and Swamp Creek hydroelectric projects in the State of Washington for not more than two consecutive two-year periods. Directs the Commission to reinstate any expired license for such project and extend for not more than two consecutive two-year periods, the time required for the licensee to commence project construction.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 20 March 1997

    Introduced

    Referred to the House Committee on Commerce.

    Source: IntroReferral

  2. 20 March 1997

    Introduced

    Introduced in House

    Source: IntroReferral

  3. 20 March 1997

    Introduced

    Introduced in House

    Source: IntroReferral

  4. 4 April 1997

    Referred

    Referred to the Subcommittee on Energy and Power.

    Source: Committee

Votes

No vote records are attached yet.

Versions

Documents

3 official files

Introduced in House (text)

View fileDownload file

Sponsors

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.