Skip to content
PoliticalRepoPoliticalRepo

United States · Bill · HR

H.R. 1863 (117th)

Public School Green Rooftop Program

referredUnited States· United States Congress· EN

Introduced

11 March 2021

Last action

11 March 2021 · Introduced

Status

Referred to the House Committee on Education and Labor.

Sponsors

Rep. Velázquez, Nydia M. [D-NY-7], Rep. Espaillat, Adriano [D-NY-13], Rep. Takano, Mark [D-CA-39], Del. Norton, Eleanor Holmes [D-DC-At Large], Rep. Thompson, Bennie G. [D-MS-2], Rep. Jones, Mondaire [D-NY-17], Rep. Barragán, Nanette Diaz [D-CA-44], Rep. Jackson Lee, Sheila [D-TX-18], Rep. Lowenthal, Alan S. [D-CA-47], Kaiali'i Kahele, Rep. Sires, Albio [D-NJ-13], Rep. Scanlon, Mary Gay [D-PA-5], Rep. Blumenauer, Earl [D-OR-3], Rep. Hayes, Jahana [D-CT-5], Rep. Lynch, Stephen F. [D-MA-8], Marie Newman, Rep. Jayapal, Pramila [D-WA-7], Rep. Clarke, Yvette D. [D-NY-9], Rep. Smith, Adam [D-WA-9], Rep. Maloney, Carolyn B. [D-NY-12], Rep. Schrier, Kim [D-WA-8], Rep. Grijalva, Raúl M. [D-AZ-7], Rep. Strickland, Marilyn [D-WA-10], Rep. Bowman, Jamaal [D-NY-16]

Subjects

Energy, Education

Source updated

21 July 2025

Energy · Education

Summary

Public School Green Rooftop Program This bill directs the Department of Energy (DOE) to establish a grant program for installing and maintaining green roof systems on public elementary and secondary school buildings. Green roof refers to a layer of vegetation that is planted over a waterproofing system or to a waterproof management practice that is installed on a roof and may support plant growth. Specifically, DOE must award grants to public elementary and secondary schools, local educational agencies, and partnerships with nonprofit organizations to (1) pay the costs of planning assistance for green roof systems on school buildings (e.g., assessing structures, conducting financial and engineering analyses, and receiving cost estimates), and (2) install green roof systems on these buildings. Additionally, a grant recipient must complete the installation of a green roof system within four years of receiving the grant. A grant recipient that completes this installation requirement shall receive additional funding for maintenance activities, such as conducting routine inspections to monitor the condition of the green roof.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 11 March 2021

    Introduced

    Referred to the House Committee on Education and Labor.

    Source: IntroReferral

  2. 11 March 2021

    Introduced

    Introduced in House

    Source: IntroReferral

  3. 11 March 2021

    Introduced

    Introduced in House

    Source: IntroReferral

Votes

No vote records are attached yet.

Versions

Documents

3 official files

Introduced in House (text)

View fileDownload file

This file cannot be previewed here. Use View or Download.

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

  • Introduced in House (text)

    Introduced in House · EN · 11 March 2021

    ViewDownloadOpen at official source

  • Introduced in House (PDF)

    Introduced in House · EN · 11 March 2021

    ViewDownloadOpen at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

  • Introduced in House

    summary · EN · 11 March 2021

    Open at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

Related records

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.