Skip to content
PoliticalRepoPoliticalRepo

United States · Bill · HR

H.R. 2231 (99th)

Electric Utility Transmission Reform Act of 1985

referredUnited States· United States Congress· EN

Introduced

25 April 1985

Last action

30 April 1985 · Referred

Status

Referred to Subcommittee on Energy Conservation and Power.

Sponsors

Rep. Kostmayer, Peter H. [D-PA-8]

Subjects

Energy

Source updated

29 August 2025

Energy

Summary

Electric Utility Transmission Reform Act of 1985 - Amends the Federal Power Act to require the Federal Energy Regulatory Commission to direct by order an electric utility to provide transmission services for an applicant electric utility or to increase the transmission capacity of any bulk power transmission facility which it owns or operates whenever the Commission, upon its own motion or upon application by a State commission or any electric utility, determines after public notice, notice to the State commission and electric utilities affected, and a hearing that such action is needed to conserve energy, promote the efficient use of facilities and resources, increase competition in the bulk power supply market, or protect the public interest. Provides that the Commission shall have no authority under this Act to: (1) compel the enlargement of generating facilities; (2) take any action which would significantly reduce the utility's ability to provide adequate service to its customers; or (3) order the transmission of electric energy to an ultimate customer. Provides that an electric utility which has been ordered by the Commission to increase its transmission capacity shall be reimbursed by the recipient utility services for all capital and operating costs related to such increase. Repeals the Commission's authority to prescribe in a final order requiring interconnection or wheeling any terms and conditions regarding transmission services if the parties cannot agree to such services within the time set by the Commission.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 25 April 1985

    Introduced

    Referred to House Committee on Energy and Commerce.

    Source: IntroReferral

  2. 25 April 1985

    Introduced

    Introduced in House

    Source: IntroReferral

  3. 25 April 1985

    Introduced

    Introduced in House

    Source: IntroReferral

  4. 30 April 1985

    Referred

    Referred to Subcommittee on Energy Conservation and Power.

    Source: Committee

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.