United States · Bill · HR
H.R. 2282 (104th)
To modify the navigation project for the Thames River, Connecticut to alter the dimensions of a turning basin in Norwich, Connecticut.
Introduced
7 September 1995
Last action
—
Status
Referred to the Subcommittee on Water Resources and Environment.
Sponsors
—
Subjects
Discovery layer
Source updated
2 January 2025
Summary
Reconfigures the turning basin of the Thames River, Connecticut, navigation project in accordance with a specified alignment. Requires any required initial dredging of the widened portions of the basin to be accomplished at non-Federal expense. Deauthorizes the portions of the existing basin that are not included in the reconfigured basin.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Introduced in House (text)
Introduced in House (text)
Introduced in House · EN · 7 September 1995
Introduced in House (PDF)
Introduced in House · EN · 7 September 1995
Introduced in House
summary · EN · 7 September 1995
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/104th-congress/house-bill/2282
- Open data entity: https://api.congress.gov/v3/bill/104/hr/2282