United States · Bill · HR
H.R. 2749 (118th)
Efficient Grid Interconnection Act of 2023
Introduced
20 April 2023
Last action
20 April 2023 · Introduced
Status
Referred to the House Committee on Energy and Commerce.
Sponsors
Rep. Castor, Kathy [D-FL-14], Rep. Casten, Sean [D-IL-6], Rep. Peters, Scott H. [D-CA-50]
Subjects
Environment, Energy
Source updated
24 July 2024
Summary
Efficient Grid Interconnection Act of 2023 This bill establishes requirements concerning (1) the equitable allocation of costs for electric grid upgrades; and (2) the deployment of grid enhancing technology or equipment that increases the capacity, efficiency, or reliability of a transmission facility or transmission system. Specifically, it directs the Federal Energy Regulatory Commission (FERC) to issue regulations that require public electric utilities to allocate the cost of upgrades to the electric grid, such as upgrades to interconnect renewable generation projects, among all customers that benefit from the upgrades. In determining which parties benefit, FERC must consider all material benefits of the network upgrade, including environmental benefits and those that cannot be directly quantified. In addition, FERC must issue regulations that apply to regional transmission organizations, independent system operators, or transmission planning coordinators when they are processing requests to interconnect generation projects or energy storage projects to the electric grid. The regulations must require such organizations, operators, and coordinators to study deploying technology or equipment that increases the capacity, efficiency, or reliability of a transmission facility or transmission system.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
20 April 2023
Introduced
Referred to the House Committee on Energy and Commerce.
Source: IntroReferral
20 April 2023
Introduced
Introduced in House
Source: IntroReferral
20 April 2023
Introduced
Introduced in House
Source: IntroReferral
Votes
No vote records are attached yet.
Versions
- Introduced in House · 20 April 2023 · Download file
Documents
3 official files
Introduced in House (text)
This file cannot be previewed here. Use View or Download.
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Introduced in House (text)
Introduced in House · EN · 20 April 2023
Introduced in House (PDF)
Introduced in House · EN · 20 April 2023
ViewDownloadOpen at official source
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Introduced in House
summary · EN · 20 April 2023
Leesvertaling
Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.
Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.
Sponsors
- Rep. Castor, Kathy [D-FL-14] · D · Sponsor
- Rep. Casten, Sean [D-IL-6] · D · Sponsor
- Rep. Peters, Scott H. [D-CA-50] · D · Sponsor
- · hsif00 · Standing
Related records
- related to ← Efficient Grid Interconnection Act of 2021
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/118th-congress/house-bill/2749
- Open data entity: https://api.congress.gov/v3/bill/118/hr/2749
- us · 118-hr-2749 · source updated 24 July 2024