Skip to content
PoliticalRepoPoliticalRepo

United States · Bill · HR

H.R. 3240 (117th)

National Strategic and Critical Minerals Production Act of 2021

referredUnited States· United States Congress· EN

Introduced

14 May 2021

Last action

18 June 2021 · Referred

Status

Referred to the Subcommittee on Energy and Mineral Resources.

Sponsors

Rep. Amodei, Mark E. [R-NV-2], Rep. Westerman, Bruce [R-AR-4], Rep. Young, Don [R-AK-At Large], Rep. LaMalfa, Doug [R-CA-1], Rep. Fulcher, Russ [R-ID-1], Rep. Reschenthaler, Guy [R-PA-14], Rep. Lesko, Debbie [R-AZ-8], Rep. McMorris Rodgers, Cathy [R-WA-5], Rep. Biggs, Andy [R-AZ-5], Rep. Newhouse, Dan [R-WA-4], Rep. Stewart, Chris [R-UT-2], Yvette Herrell, Rep. Emmer, Tom [R-MN-6], Rep. Stauber, Pete [R-MN-8], Rep. Boebert, Lauren [R-CO-4]

Subjects

Environment, Energy, Transport

Source updated

3 January 2025

Environment · Energy · Transport

Summary

National Strategic and Critical Minerals Production Act of 2021 This bill sets forth environmental review requirements for the mine permitting process and limits the review to 30 months. Under the bill, projects that provide minerals vital to job creation, energy infrastructure, coastal resilience and restoration, economic competitiveness, and national security must be considered to be infrastructure projects as described in Executive Order 13807, titled Establishing Discipline and Accountability in the Environmental Review and Permitting Process for Infrastructure Projects and dated August 15, 2017. This order directed agencies to ensure that the environmental review and permitting process for infrastructure is coordinated, predictable, and transparent. The Bureau of Land Management (BLM) or the Forest Service must appoint a project lead for the mine permitting process to coordinate with other agencies to ensure that the agencies minimize delays, set and adhere to timelines for completion of the permitting process, set clear permitting goals, and track progress against goals. The project lead must also determine the amount of financial assurance required for reclamation of a mineral exploration or mining site. The bill considers the requirements of the National Environmental Policy Act of 1969 to be satisfied if the BLM or the Forest Service determines that the agency issuing the permit will address specified factors, such as environmental impacts of the permit or alternatives to issuance of the permit. Additionally, the bill exempts projects on National Forest System land from regulations that prohibit timber tree cutting and road construction in areas without roads.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 14 May 2021

    Introduced

    Referred to the House Committee on Natural Resources.

    Source: IntroReferral

  2. 14 May 2021

    Introduced

    Introduced in House

    Source: IntroReferral

  3. 14 May 2021

    Introduced

    Introduced in House

    Source: IntroReferral

  4. 18 June 2021

    Referred

    Referred to the Subcommittee on Energy and Mineral Resources.

    Source: Committee

Votes

No vote records are attached yet.

Versions

Documents

3 official files

Introduced in House (text)

View fileDownload file

This file cannot be previewed here. Use View or Download.

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

  • Introduced in House (text)

    Introduced in House · EN · 14 May 2021

    ViewDownloadOpen at official source

  • Introduced in House (PDF)

    Introduced in House · EN · 14 May 2021

    ViewDownloadOpen at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

  • Introduced in House

    summary · EN · 14 May 2021

    Open at official source

    Leesvertaling

    Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

    Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

Related records

No cross-record relationships stored yet.

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.