United States · Bill · HR
H.R. 3280 (112th)
Powering America for Tomorrow Act
Introduced
27 October 2011
Last action
—
Status
Referred to the Subcommittee on Energy and Power.
Sponsors
—
Subjects
Discovery layer
Source updated
14 August 2025
Summary
Powering America for Tomorrow Act - Amends the Federal Power Act to direct the Federal Energy Regulatory Commission (FERC) to designate one or more regions within the Eastern Interconnection and the Western Interconnection to be represented by specified regional transmission planners. Sets forth application and approval procedures for regional transmission planners. Prescribes: (1) a regional transmission plan design; and (2) a regional transmission planning process. Requires the federal power marketing administrations and transmitting utilities in a designated region to integrate their transmission plans with the regional transmission plans required under this Act, and to otherwise participate in a regional transmission planning process. Directs FERC to require that: (1) all regional high voltage electric transmission cost allocation processes and methodologies adhere to a clear and consistent set of specified regulatory principles; and (2) regional transmission planners coordinate planning across regional boundaries within an Interconnection. Authorizes a regional transmission planner, as part of a plan submitted to FERC, to identify regional transmission projects required by, and consistent with, the public convenience and necessity. Instructs FERC, in issuing a certificate of public convenience and necessity, to give substantial deference to any proposed finding of public convenience and necessity in the plan submitted by a regional transmission planner. Excludes from review for any environmental assessment or environmental impact statement required under the National Environmental Policy Act of 1969 any proposed finding by a regional transmission planner of public convenience and necessity with respect to a regional transmission project. Retains state exclusive authority over the siting of any transmission facility that is not a part of a regional transmission project. Specifies federal siting authority with respect to any transmission facility identified as part or all of a regional transmission project for which a certificate of public convenience and necessity has been issued.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Introduced in House (text)
Introduced in House (text)
Introduced in House · EN · 27 October 2011
Introduced in House (PDF)
Introduced in House · EN · 27 October 2011
Introduced in House
summary · EN · 27 October 2011
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/112th-congress/house-bill/3280
- Open data entity: https://api.congress.gov/v3/bill/112/hr/3280