United States · Bill · HR
H.R. 4193 (114th)
To authorize the expansion of an existing hydroelectric project.
Introduced
8 December 2015
Last action
—
Status
Referred to the Subcommittee on Water, Power and Oceans.
Sponsors
—
Subjects
Discovery layer
Source updated
5 December 2025
Summary
This bill authorizes the licensee for the Terror Lake Hydroelectric Project (Federal Energy Regulatory Commission [FERC] project number 2743) to occupy up to 20 acres of federal land to construct, operate, and maintain the Upper Hidden Basin Diversion Expansion without further authorization of the Department of the Interior or under the Alaska National Interest Lands Conservation Act. This is the expansion of the Terror Lake Hydroelectric Project described in the Upper Hidden Basin Grant Application dated July 2, 2014, as submitted by Kodiak Electric Association, Inc., to the Alaska Energy Authority Renewable Energy Fund Round VIII. The Expansion must meet the terms and conditions contained in any amendment to a license which may be issued by FERC subsequent to its environmental review under the National Environmental Policy Act of 1969.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
3 official files
Introduced in House (text)
Introduced in House (text)
Introduced in House · EN · 8 December 2015
Introduced in House (PDF)
Introduced in House · EN · 8 December 2015
Introduced in House
summary · EN · 8 December 2015
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/114th-congress/house-bill/4193
- Open data entity: https://api.congress.gov/v3/bill/114/hr/4193