United States · Bill · HR
H.R. 4290 (95th)
A bill to authorize the construction of replacement locks and dam for Locks and Dam 26, Mississippi River, Alton, Ill., to revoke authority for 12-foot channel studies on the upper Mississippi River and its tributaries.
Introduced
2 March 1977
Last action
—
Status
Referred to House Committee on Public Works and Transportation.
Sponsors
—
Subjects
Discovery layer
Source updated
1 August 2024
Summary
Authorizes the Secretary of the Army, acting through the Chief of Engineers, to construct a replacement lock and dam project on the Mississippi River near Alton, Illinois. Authorizes the Secretary to undertake steps to provide for wildlife protection and recreational activities in conjunction with such project. Withdraws all authority for the Secretary of the Army to construct or study the feasibility of construction or modification of a channel in the Mississippi River north of its juncture with the Illinois River. Withdraws the authority of: (1) any Federal agency to study the feasibility of deepening the navigation channels in the Minnesota River, Minnesota; Black River, Wisconsin; Saint Croix River, Minnesota and Wisconsin; Illinois River, Illinois; and the Mississippi River north of its junction with the Missouri River, Missouri; and (2) the Secretary of the Army to study or construct a specified Mississippi River channel. Authorizes the Secretary of the Army, acting through the Chief of Engineers, to construct a replacement lock and dam project on the Mississippi River near Alton, Illinois. Authorizes the Secretary to undertake steps to provide for wildlife protection and recreational activities in conjunction with such project. Withdraws all authority for the Secretary of the Army to construct or study the feasibility of construction or modification of a channel in the Mississippi River north of its junction with the Illinois River. Withdraws the authority of: (1) any Federal agency to study the feasibility of deepening the navigation channels in the Minnesota River, Minnesota; Black River, Wisconsin; Saint Croix River, Minnesota and Wisconsin; Illinois River, Illinois; and the Mississippi River north of its junction with the Missouri River, Missouri; and (2) the Secretary of the Army to study or construct a specified Mississippi River channel.
This text is taken from the official record. PoliticalRepo does not editorialize.
Timeline
No timeline events have been ingested for this record yet.
Votes
No vote records are attached yet.
Versions
No version snapshots stored. Document URLs remain at the source.
Documents
1 official file
Introduced in House
summary · EN · 2 March 1977
Sponsors
No sponsors or actors listed by the source.
Related records
No cross-record relationships stored yet.
Sources
PoliticalRepo is an index and interpretation layer, not the authoritative legal source.
- Official source: https://www.congress.gov/bill/95th-congress/house-bill/4290
- Open data entity: https://api.congress.gov/v3/bill/95/hr/4290