Skip to content
PoliticalRepoPoliticalRepo

United States · Bill · HR

H.R. 5341 (99th)

A bill to waive the required Congressional review period for a natural gas pipeline to be built by Tennessee Gas Pipeline Company across certain Army Corps of Engineers land in Massachusetts.

referredUnited States· United States Congress· EN

Introduced

6 August 1986

Last action

19 August 1986 · Referred

Status

Referred to Subcommittee on Mining and Natural Resources.

Sponsors

Rep. Boland, Edward P. [D-MA-2]

Subjects

Energy

Source updated

7 February 2024

Energy

Summary

Waives the congressional review period required by the Mineral Leasing Act of 1920 for a certain underground natural gas pipeline to be constructed by the Tennessee Gas Pipeline Company across specified Army Corps of Engineers lands in Massachusetts.

This text is taken from the official record. PoliticalRepo does not editorialize.

Timeline

  1. 6 August 1986

    Introduced

    Referred to House Committee on Interior and Insular Affairs.

    Source: IntroReferral

  2. 6 August 1986

    Introduced

    Introduced in House

    Source: IntroReferral

  3. 6 August 1986

    Introduced

    Introduced in House

    Source: IntroReferral

  4. 19 August 1986

    Referred

    Referred to Subcommittee on Mining and Natural Resources.

    Source: Committee

Votes

No vote records are attached yet.

Versions

No version snapshots stored. Document URLs remain at the source.

Documents

1 official file

Leesvertaling

Vertaal dit document naar jouw taal. PoliticalRepo bewaart geen aparte kopie per EU-taal.

Documentvertaling op verzoek met downloadbare PDF (logo + link naar de officiële bron). Het bronbestand blijft leidend.

Sponsors

Related records

Sources

PoliticalRepo is an index and interpretation layer, not the authoritative legal source.